Prepared Remarks:

Operator

Thank you for standing by. This is the conference operator. Welcome to the Endeavour Silver, Q1 Financial Results Conference Call. [Operator Instructions]. After the presentation, there will be an opportunity to ask questions. [Operator Instructions]. I would now like to turn the conference over to Galina Meleger, Director of Investor Relations. Please go ahead.

Galina Meleger -- Director Investor Relations

Thank you, operator. Good morning, everyone, and welcome to the Endeavour Silver 2020 First Quarter Financial Results Conference Call. With me on the line today, we have the Company's Chief Executive Officer, Bradford Cooke; our Chief Financial Officer, Dan Dickson; and our Chief Operating Officer, Godfrey Walton.

Before we get started, I'm required to remind you that certain statements on today's call will contain forward-looking information within the meaning of applicable securities laws. These may include statements regarding Endeavour's anticipated performance in 2020 and future years, including revenue and cost figures, silver and gold production, grades and recoveries and the timing and expenditures required to develop new silver mines and mineralized zones.

We do not intend to and do not assume any obligation to update such forward-looking information, other than as required by applicable law. So on behalf of Endeavour Silver, I'd like to thank you again for joining our call.

And I'll now turn it over to our CEO, Brad Cooke.

Bradford Cooke -- Chief Executive Officer

Thank you very much, Galina, and welcome everybody to this conference call on our first quarter financials. I'd like to start by pointing out that the numbers released today show that we're not out of the woods yet, but we did make great strides during the first quarter, both in operations and in our financial performance.

Let me explain. From the operational point of view, we were significantly better compared to both the first quarter and the fourth quarter last year. Our Q1 production was actually in general line with our guidance for the year prior to the government-mandated suspension of our mining operations. One of the key takeaways in our operational performance was the sharp decline in our cash cost, 37% down year-on-year. That reflects primarily the success of our operational turnaround and our transition into higher-grade ore bodies at our largest silver mine, Guanacevi.

All-in sustaining costs also fell by only 5%, and that reflects the still elevated sustaining capex that we are investing to achieve a similar turnaround at Bolanitos over the next three months to -- compared to what we achieved already at Guanacevi. I should point out that the significant headline net loss, almost half of that can be attributed to foreign exchange event. Basically, the 25% depreciation of the Mexican peso devalued both our peso receivables and caused a deferred income tax expense.

Other extraordinary items that hit our bottom line include the still elevated care and maintenance costs at our now closed El Cubo mine in Q1. Those costs will decline going forward. There's really no more severance to be had at Cubo, and there's a significant reduction in security costs coming.

We still report high -- a relatively high mine depletion due to our short reserve lives, and we're working through our exploration group to try and extend those reserve lives. Guanacevi has been a success from that point of view. And even though the government shut us down, April 1st, the government has now declared in Mexico that municipalities with lower no COVID-19 cases can look to start-up again May 18th. And since each of our three mines are located in such municipalities, we're now in advanced planning stages to bring our three mines back to production in May.

So moving to the first quarter highlights. Metal production was 857,000 ounces of silver and 8,500 ounces of gold. And on an equivalent basis, that's 1.5 million ounces of silver equivalents at an 80:1 ratio, 1.8 million ounces at the current 110:1 ratio, and that drove about $22 million in revenues. Cash flow and net income, as I pointed out were negative, primarily due to the significant foreign exchange expense.

Balance sheet at the end of the quarter was $15 million cash, $27 million working capital, long-term liabilities. We have some term loans on equipment. Operating costs, we basically cleared the quarter with a cash cost of $7.85 per ounce of payable silver and the all-in sustaining costs were $18 and change.

Couple more quick highlights from the operations. I've already highlighted that Guanacevi, the turnaround is now complete. We are able to tick that box, and what was our largest money loser last year made a small amount of money on a mine site operating basis in Q1. Moving to the development projects. We do expect in June to release the final optimization of our pre-feasibility study and the economics therein, using our in-house expertise as well as an independent engineering firm.

So Terronera is advancing steadily. And on the exploration front, we do have some decent drill news coming from both Guanacevi and Bolanitos. We expect those news releases in the coming months. So those are the highlights of the quarter. And I think now, operator, let's just open it up for Q&A.

Questions and Answers:

Operator

Thank you. We will now begin the question-and-answer session. [Operator Instructions]. The first question is from Heiko Ihle of H.C. Wainwright. Please go ahead.

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Hi guys, thanks for taking my questions.

Bradford Cooke -- Chief Executive Officer

Hello, Heiko.

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Hey there. This question may be a bit out there. But I mean, you're talking about higher maintenance costs at El Cubo. How much of a potential, given all the social distancing issues that we're having in the world, is there a way that you can use the workers from Bolanitos to take care of some of that maintenance work and thereby save some costs in order to then also create some distancing that you're probably required to do?

Dan Dickson -- Chief Financial Officer

Hey, Heiko, it's Dan. I hope all is well. The main thing in Q1 at El Cubo was just getting all the fleet effectively maintained, raising the mill in the plant, getting things all cleaned up. We haven't gone to close or anything like that. Just kind of putting everything as it is. We also had about $200,000 of severance costs in what we spent at El Cubo and depreciation of the plant, light vehicles, office and IT equipment.

So you'll see that care and maintenance costs of Cubo come down significantly going forward. I think we have a staff of about ten security and ten individuals. So a total of 20, 25 people there. Guanajuato or Bolanitos and El Cubo are about 45 minutes away. So that's real social distancing in that context.

So now ultimately, the key for us as Cubo going forward is just maintaining security at the site. And monitoring the tailings facility with the town right there. But you're talking about $200,000 for next quarter compared to what we just spent for $1 million.

Bradford Cooke -- Chief Executive Officer

And so that with significant reduction includes a reduction in the security staff as well. And Dan's numbers reflect current numbers, right?

Dan Dickson -- Chief Financial Officer

Yeah.

Bradford Cooke -- Chief Executive Officer

We are still working diligently to find a way to restart Cubo. It does require us to do some land acquisitions and/or exploration. And it's a work-in-progress. So nothing to say on that yet, but that's the whole purpose of continuing to keep Cubo on care and maintenance.

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Maybe I'm the eternal optimist, but I have a feeling that mine at some point in time will reopen. I don't want to open Pandora's box too much here, but I'll bring it up since you put it into the third paragraph of your earnings release with almost half the net loss being due to the 25% devaluation of the Mexican pesos. At what point in time, if ever, and the answer might be, never. At what point in time would you ever consider hedging some currencies or something, just to avoid future large-scale impacts and swings that -- maybe get taken a little bit out of context by some folks reading earnings releases?

Bradford Cooke -- Chief Executive Officer

Well, the peso devaluation is a good news/bad news. It hits our assets, but it's great for our costs. So we don't mind the lower peso at all. And we would not hedge the peso. It would impact our costs. We think the direction of the peso is more and more depreciation relative to the dollar.

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Okay. So I understand that. But I mean, you might still, at some point in time, things might go the other way for you. And just because you've won so far, it doesn't mean you're going to come out ahead for good now?

Bradford Cooke -- Chief Executive Officer

Well, that's a fair question from a conceptual point of view, but from a practical point of view, we've been in Mexico 16 years, and the peso has gone at one direction, and one direction only, it was 10:1 in 2003. It's 25 -- 24:1 right now.

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Okay. Fair enough, thank you guys, I'll get back in queue.

Bradford Cooke -- Chief Executive Officer

Okay, thanks for your questions.

Operator

The next question is from Joseph Reagor of Roth Capital Partner. Please go ahead.

Joseph Reagor -- Roth Capital Partner -- Analyst

Good morning guys, thanks for taking my questions as well. I guess, maybe following on Heiko's questions about currency. What percentage of your total cost you think benefit from the weaker peso going forward?

Dan Dickson -- Chief Financial Officer

Yes. Dan. Thanks, Joe, for the question. 30% of our costs are directly tied to labor and our cost of sales. So 25% reduction in our labor costs for the foreseeable future can be built in pretty quickly. And then of the remaining 70% of costs, about half of that comes from sourced out of Mexico and tied to the Mexican peso. Eventually, you'll see those costs adjust a lot quicker than what typically you'd see from a labor standpoint. But we generally, we're expecting about 45% to 50% of our costs to be affected by the depreciation of the peso.

Joseph Reagor -- Roth Capital Partner -- Analyst

Okay. So in the sense, by Q3, if we stay at this level, we could be looking at a 10% to 12% reduction in costs?

Dan Dickson -- Chief Financial Officer

Yes. That's fair.

Bradford Cooke -- Chief Executive Officer

Yeah. And keep in mind that most of the depreciation was in the last two weeks of March. So it hit our assets right away, but it hasn't hit our costs yet. It's just hitting our costs now.

Joseph Reagor -- Roth Capital Partner -- Analyst

Okay. Then on the COVID-19 front, what should we expect as far as capital spending in Q2? I mean given you guys spend almost half the quarter with your mines shut down. I would anticipate it's a lower capital spend, in that the guide at the beginning of the year for capital spending has probably been reduced in general as well, right?

Dan Dickson -- Chief Financial Officer

Yeah. No. That's fair. For the quarter, I mean, ultimately, we still have all the mine development in the plans that we had. Everything is just going to be delayed by six weeks to seven weeks. So in Q1, we spent or had total additions of about $9 million. In Q2, it'll probably be closer to $5 million, just because of the delay of six, seven weeks.

Joseph Reagor -- Roth Capital Partner -- Analyst

Okay. Then shifting gears a bit. Guanacevi royalties as a percent of revenue kind of spiked in Q4 last year, and they stayed elevated in Q1 of this year. Is that a reflection of mining from an area where you guys pay a higher royalty? Is that just some kind of short term issue? Or is there something else at work there?

Bradford Cooke -- Chief Executive Officer

No, you're exactly right, Joe. It's Brad here. We have a new properties last year called El Curso, and a new discovery that we developed in Q4 and have been producing since late last year. And that particular property has quite a high royalty on it to a Mexican group. Whereas the other portions of the Guanacevi operating unit have much, much lower royalties. So it's just that. We did put an emphasis in Q1 on mining the El Curso areas simply because it's got phenomenally higher grades.

But we do also have in our plan this year to go back to a more reasonable mix of Curso versus other ores. Milache, for instance, so we're just about caught up on the mine development. So it should be able to do more percentage tonnes to the plant going forward and Santa Cruz Sur also is in the advanced stages now of development and should also do a higher contribution going forward.

Maybe not in Q2, but because we basically spent seven weeks of standing still, but certainly Q3 and onwards.

Joseph Reagor -- Roth Capital Partner -- Analyst

Okay. That's helpful. And then last thing. I know you guys used a little bit of the ATM in Q1, a little more to start Q2. What's left available to you guys on that?

Dan Dickson -- Chief Financial Officer

We filed a new base shelf. You would have seen it. April 27, they got finalized. That sterilized the remaining amount on that ATM, which was about $500,000. So that ATM program is now over.

Joseph Reagor -- Roth Capital Partner -- Analyst

Okay, that's helpful. Thanks guys.

Bradford Cooke -- Chief Executive Officer

You're welcome.

Operator

The next question is from Chris Thompson of PI Financial. Please go ahead.

Chris Thompson -- PI Financial -- Analyst

Hey, good morning guys. Thanks for taking my questions. Yes, look, tough quarter. Got a couple of maybe tough questions here. Firstly, the standby costs, I guess for the three operating mines, Dan, you said $5 million is for the Q2. Is that what we can anticipate the cost to be?

Dan Dickson -- Chief Financial Officer

That's not cost. That was capital expenditures for Q2. So on -- in our original guidance for 2020, total capital spend for 2020 was going to be $32 million in Q1. We spent $9 million. Joe's question, just -- asked how much would our cost of capital -- we're going to spend on capital in Q2. Typically, that $32 million is going to be split pretty evenly through the year. So $8 million to $9 million a quarter. And just because we've been shut down for six, seven weeks this quarter, I don't see that spend being larger than the $5 million just for Q2, but that -- we still need to get to that 32%, and maybe that goes into 2021 a little bit, Chris.

But that won't change because of COVID. We still have our mine development programs that we have to get done and get accelerated, so we can maintain these production levels.

Chris Thompson -- PI Financial -- Analyst

Okay. Thanks for the clarification on that. Just looking at, I guess, Guanacevi and by the way, congratulations for bringing down those costs. You know, obviously, Santa Cruz Sur, Milache coming on stream. You did mention, I guess, in your text, P4E was behind plan. I'm just trying to understand what component of mill feed is that? Is that minor or major?

Bradford Cooke -- Chief Executive Officer

So yeah, we'll need to explain that. We use in-house, the extension of a Porvenir Cuatro orebody onto the El Curso property. We call that orebody P4E, Porvenir Cuatro extension. And maybe in Q4, it was still under development, but I don't think we referred to that one being behind plan. Maybe SCS. Maybe, Santa Cruz Sur.

Dan Dickson -- Chief Financial Officer

Santa Cruz Sur, we're slightly behind from development standpoint. And that just reflected that. In March, when we saw silver dip into the 12 handle, we focused on increasing production from El Curso, which has higher gold grades and higher silver grades. And then just kind of moved away from Santa Cruz. So we'll pick up the development that go into Santa Cruz and ultimately, what we're looking for, what we originally were looking for and depending where prices go, is basically a-third of our production coming from Santa Cruz Sur, a third coming from Milache and a-third coming from El Curso.

And what we've never had in the past -- or I shouldn't say never, what we haven't had in the recent past, it's Guanacevi, Chris. It's just that flexibility. So, as soon as we got stuck in one area, we weren't hitting our tonnage, and in Q1, we're just short of 1,000 tonnes per day. And our goal is to get up to 1,200 tonnes per day. So having Santa Cruz Sur catch-up from development, allows us to hit the 1,200 tonnes per day for the next eight months, so to speak.

Chris Thompson -- PI Financial -- Analyst

Okay. Thanks for that. Thanks. And just remind us, what sort of turnaround time are you looking for Bolanitos and El Compas? I mean, they are somewhat delayed, I get it. But obviously, hopefully, following the same track as Guanacevi, but maybe quantify the turnaround time there for us.

Bradford Cooke -- Chief Executive Officer

Yeah. We started the turnaround in Guanacevi after the first quarter last year. So it took basically a year. We started the turnaround of Bolanitos in Q3 last year, and it will take about a year. So of course, this quarter was pretty much discounted, but we do expect to break through in Q3.

Chris Thompson -- PI Financial -- Analyst

Right. Okay. I'm looking at the depreciating, I'm looking at the dwindling cash position right now, and I'm a little concerned you might not have a luxury of time here for this turnaround. I mean at what point do you actually maybe just dial it back, and just live off Guanacevi. I know it's a tough question, but I have to answer -- ask it.

Dan Dickson -- Chief Financial Officer

No. That's a fair question, Chris. I think you'll see once you get through the numbers with Q1, Bolanitos cost per tonne came down to $68.25 or even $68.50, which is an improvement. And we can get lower from that standpoint. And what Bolanitos was short on was tonnes this quarter. And the idea, I think, we came in around 87,000 tonnes, and we want to be up around 100,000 tonnes is in the plan. Ultimately, we have two areas, one, San Miguel, which we discovered last year. We've got about 300 meters more development in there to get that to full capacity and be really contributing at Bolanitos.

So we're not far away there. And then we also have a [Indecipherable] we call Melladito, which is about 300 meters away from working. So it needs some development again there, but it will give us flexibility and be able to get into the above the 1,000 tonnes per day to 1,200 tonnes per day later this year. So as Brad touched on it. So we're about three months away from seeing Bolanitos turnaround.

We've done a good job from a cost standpoint. Now it just means getting these tonnes to where it historically has been. We're not that far. So that's why we expect, hopefully, by Q3, in middle of Q3 just because of the delay of, like I say, with the COVID delay, but Bolanitos is a lot closer to the turnaround, and it's just hitting that tonnage output now.

Bradford Cooke -- Chief Executive Officer

And if I could add, Chris, that the cash costs are already down at Bolanitos. And the reason is that the operational turnaround, the changes in management, the change of mine methods, the addition of new equipment, all of that's had an impact. But we still have elevated capital investing, which is the accelerated mine development at San Miguel and Melladito. That 300 meters remaining to do at San Miguel is not to get to the ore. We're already at the ore. Now we have to drive sills and raises and ramps and that -- it'll be fully ready for production. So not that much time left to, and not that much capital investment left to, to get Bolanitos, get that up and running in the proper way.

Dan Dickson -- Chief Financial Officer

On the second part of your question with regards to El Compas, maybe it's not as easy to see for Compas. Compas is a very small mine contributor for us. With it being 1 million silver ounces. And costs were elevated in Q1. We made a change. We've been moving from contractors to employees.

So we did onboarding and training in March and got rid of the contract of those mining underground. And our mine tonnes actually dipped significantly in March, but we expect that to come back up, now that our staff was also in place and ready to go.

So hopefully, here in late May, we can get going. We can ramp up relatively quickly at Compas. And if we can hit the tonnes and grade and then our costs should -- we again, seems things that it's hard to see in Q1, but those costs are going to come down significantly with the contractors out of the mine.

Chris Thompson -- PI Financial -- Analyst

Right. Okay. And then Dan, maybe the final question for you here. Your equipment leases and loans, did you push those out by three months?

Dan Dickson -- Chief Financial Officer

Yeah, we have $11.5 million of total equipment loans, and it's all to do with the turnaround and refreshing our fleet. And we went to Sandvik. And just to be careful, at the start of the COVID-19 and the shutdown April 1st, the government had come out and said, shut down until April 30th. But as we've seen globally, those goalposts have continued to change. And we want just to protect ourselves. So with Sandvik, we approached them immediately, and they're very happy to work with us on it. And we just delayed principal payments by three months. So we didn't have to pay any of that until August, and it just gives us a little bit of flexibility.

Now I think we're probably being too conservative. Those are in place now, as is. And with us, hopefully, getting going here, May 18th we'll be fine. But at the time, we're looking for any alternatives to save cash, in case this would have gone through the summer in Mexico.

Chris Thompson -- PI Financial -- Analyst

All right, OK. Guys, thank you very much.

Dan Dickson -- Chief Financial Officer

Thanks for your questions.

Operator

The next question is from Craig Hutchison of TD Bank. Please go ahead.

Craig Hutchison -- TD Bank -- Analyst

Hi, guys. Thanks for taking my call. I think most of my questions have been answered. But I was just wondering, once you guys get the green light from the Mexican government to go ahead and restart these operations, how long do you think it's going to take to kind of get your back up to full run capacity?

Dan Dickson -- Chief Financial Officer

Godfrey, if you're on the line, do you want to handle that one? Sure. Craig, thanks for your question. We are doing a little bit of prep work to make the start-up a little bit faster. But I think it's going to be probably, say, three weeks to get up and running properly. We have a few maintenance issues that we've taken care of during the shutdown. And so Guanacevi should come up very, very quickly, but Bolanitos and Compas should be probably the slower ones coming up. So Compas maybe more like, three weeks to four weeks? Bolanitos, probably two to four. And Guanacevi, I think it'll be up and running in about two weeks.

Craig Hutchison -- TD Bank -- Analyst

Okay. Perfect. And then just following up on the question on the ATM. I know you guys mentioned that the new shelf sterilized the old ATM. Are you now able to access the new financing ATM? Or is that still [Speech Overlap]

Dan Dickson -- Chief Financial Officer

The base shelf space, we haven't put in a prospective supplement on our new ATM program to date or -- so you have to file new prospectus to get a new ATM in place.

Craig Hutchison -- TD Bank -- Analyst

Okay. So that's not in place at the moment. Okay. All right, thank you guys.

Bradford Cooke -- Chief Executive Officer

Thanks for your questions.

Operator

The next question is from Bhakti Pavani of Alliance Global Partners.

Bhakti Pavani -- Alliance Global Partners -- Analyst

Good morning guys. Thank you for taking my questions. I just have a couple of questions. Considering the ramp-up time frame at each of the individual mines, once the restrictions have been lifted. During that time, do you have any stockpiles currently on-site that maybe you can process, while you ramp up production?

Bradford Cooke -- Chief Executive Officer

Thanks for your question, Bhakti. It's Brad. And maybe, I'll refer to Godfrey on this one.

Godfrey Walton -- President and Chief Operating Officer

Hi, Bhakti, thanks for the question. Yes, we, do have about 15,000 tonnes of stockpile material at Guanacevi. And so, we'll be processing that very quickly. And we're also -- we have stockpiles -- smaller stockpiles at Bolanitos and at Compas. So we will be using those to start-up the payer plants. And then the development that we're doing ahead of fully ramping up will help to supply the tonnes as we go forward from there.

Bhakti Pavani -- Alliance Global Partners -- Analyst

Got it. And second question is from the cost standpoint. Once the operations open up, do you expect to incur any additional cost in order to comply or mitigate with the safety measures due to COVID?

Godfrey Walton -- President and Chief Operating Officer

Hi. This is Godfrey again. I -- we don't expect a lot of extra cost. There will be some. But we implemented a number of, you know, temperature checking and disinfecting and cleaning. So it's added a little bit. But in the overall scheme of things, it's not a lot, and not significant.

Bhakti Pavani -- Alliance Global Partners -- Analyst

Okay, that's it from my side. Thank you very much.

Bradford Cooke -- Chief Executive Officer

Thank you.

Operator

This concludes the question-and-answer session. I would like to turn the conference back over to Brad Cooke for any closing remarks.

Bradford Cooke -- Chief Executive Officer

Thanks, operator, and thank you all for listening in today. Again, not out of the woods yet, but good progress in the quarter. Ahead of schedule on Guanacevi. And even though we had to shut down in Q1, or sorry, Q2, and we'll get a later start, mid -- late-May for the three operations is what we're anticipating. You know, I think Bolanitos is within the next three months of operations will also show the turning of the corner that we have previously forecasted.

So I think operationally, it's a work in progress, but we've been able to tick the Guanacevi box. And we fully expect to tick the Bolanitos box this summer. Keep your eyes peeled for news coming up in May/June. We have good drill results coming from Guanacevi. Good drill results coming from Bolanitos. And a final pre-feasibility update on Terronera. So with that, operator, let's finish the call.

Operator

[Operator Closing Remarks].

Duration: 29 minutes

Call participants:

Galina Meleger -- Director Investor Relations

Bradford Cooke -- Chief Executive Officer

Heiko Ihle -- H.C. Wainwright & Co., LLC -- Analyst

Dan Dickson -- Chief Financial Officer

Joseph Reagor -- Roth Capital Partner -- Analyst

Chris Thompson -- PI Financial -- Analyst

Craig Hutchison -- TD Bank -- Analyst

Bhakti Pavani -- Alliance Global Partners -- Analyst

Godfrey Walton -- President and Chief Operating Officer

More EXK analysis

Transcript powered by AlphaStreet

This article is a transcript of this conference call produced for The Motley Fool. While we strive for our Foolish Best, there may be errors, omissions, or inaccuracies in this transcript. As with all our articles, The Motley Fool does not assume any responsibility for your use of this content, and we strongly encourage you to do your own research, including listening to the call yourself and reading the company's SEC filings. Please see our Terms and Conditions for additional details, including our Obligatory Capitalized Disclaimers of Liability.