Logo of jester cap with thought bubble.

Image source: The Motley Fool.

Golar LNG Ltd (GLNG -0.32%)
Q1 2020 Earnings Call
May 28, 2020, 10:00 a.m. ET

Contents:

  • Prepared Remarks
  • Questions and Answers
  • Call Participants

Prepared Remarks:

Operator

Ladies and gentlemen, thank you for standing by, and welcome to today's Golar LNG Limited Quarter One 2020 Results Presentation Conference Call. [Operator Instructions]

And I would now like to hand the conference over to your first speaker today, Mr. Iain Ross. Please go ahead, sir.

Iain Ross -- Chief Executive Officer

Thank you. Good morning, good afternoon, everyone. I hope you're all well. Welcome to the Golar LNG Q1 2020 results presentation. My name's Iain Ross. I'm CEO of Golar LNG. Today, I'm joined on the line by our new CFO, Callum Mitchell-Thomson; and Stuart Buchanan, Head of Investor Relations.

Before we get started, I'd like to acknowledge the huge effort by Golar staff, both pure based and of course for their effort in keeping the business running during this unprecedented disruption due to both COVID-19 and depressed commodity prices. Their dedication to Golar, and ultimately, to our shareholders is quite remarkable and worthy of this mention. The safety of our people remains our first priority. Without healthy workforce, we can't deliver for our customers. Without delivering for our customers, we won't make any money for our shareholders. It's that simple. I'd like to draw your attention to forward-looking statement on Slide 1 and if we turn to Slide 4, let me give you some highlights before Callum takes you through the numbers in more detail.

Today, we report an adjusted EBITDA of $76 million on revenue of $123 million for the quarter, which is driven by a solid FLNG performance and strong seasonal results in shipping. Our time chart for earnings is $62,000 per day for Q1 2020, represents a 58% rise over the same period last year. We continue to derisk our shipping portfolio and ended the quarter with a shipping revenue backlog of $126 million. Our FLNG operation is making 100% commercial uptime throughout the quarter, with reduced operating costs and stable EBITDA generation. And in part, we reached commercial operations on Sergipe power station, which sees the commencement of a 25 year PPA based on facility, availability and a power plant that can be called to dispatch with 60 days notice, which in turn gives great potential for additional income from merchant power. During the quarter, we had three days of dispatch. More on these segments later.

Let me firstly welcome Callum to his first results call for Golar and take us through the numbers. Thanks. Callum?

Callum Mitchell-Thomson -- Chief Financial Officer

Thank you. And if you turn to the next page, Page 5, the first quarter 2020 financial results. I'd echo what Iain said about the dedication of the staff with these tough times. And normally, one would be able to meet many of you in person on this call, so I apologize that circumstances are such that we have to do it this way, but it should work.

Turning your attention to the summary results. You can see at the bottom of the page, the adjusted EBITDA in the Q1 2020 column that Iain referred to, $76 million of adjusted EBITDA, which compares very favorably to the $63 million earned in Q1 2019. As you know, our business is seasonal. The shipping business is seasonal, so Q4 has tended to be a better quarter. Certainly, the $76 million is a small beat versus net back consensus. Where does that $76 million come from? What you can see here, from shipping and corporate, that's a $34 million figure, which again compares well to the Q1 2019 of '21 [Phonetic]. We -- as you'll see for those who are familiar with Golar, the US GAAP divisional split is shipping and corporate together, sometimes refer to as Vessel [Phonetic] operations. And as we go through for this deck, we're trying to -- we started a trend which we'll try and continue of splitting out shipping and corporate. And you'll see more of that later. So that $34 million on the shipping and corporate EBITDA is $43 million of shipping and minus $7 million of corporate. And again, that $43 million of shipping relates to the positive work that the team has done that Iain referred to.

The second point to note is the FLNG number of $42 million EBITDA, adjusted EBITDA is also stable, and that reflects the nature of the business as we think of the business and as we derisk the shipping portfolio to try and fend the contract ships, the contracts out for longer. So that is supported by the very stable nature of the Hilli and FLNG business. I would also draw your attention to some of the other movements. You will see that our contractual debt shown at the bottom of the page is relatively stable. That's -- effectively, there are two movements underlying that. There is a $95 million drawdown during the quarter on the Gimi facility. Remember, the FLNG Gimi is under construction, which is equally offset by a repayment of $70 million on a margin loan and some $24 million of scheduled debt repayments.

I would also draw your attention to the interest rate and equity derivatives number, which occurs under net loss on income, given COVID-19, and therefore, interest rates have fallen. As you all know, we've seen a mark-to-market on our swap book of a drop of between 112 basis points and 115 basis points, and that triggers a derivatives loss. In previous quarters, we've had some gains, and there was a very limited cash impact that is below the line. So the key message from this slide, stable FLNG EBITDA; shipping, favorable compared to Q1 2019, and an adjusted EBITDA of $76 million, which is a small beat versus net debt consensus.

If you now turn to Page 6. On my version, adjusted EBITDA development over the last 12 months. You will see at the bottom left of the page, the $76 million. And as always, we show quarter-on-quarter evolution on the left side of this page, and we also show the last 12 months quarterly evolution on the right side of the page. Key messages from this slide. The $76 million, compared, is lower than the Q4 2019. As I mentioned at the start Q4 2019 -- Q4 in general tends to be one of the better quarters. And the movements that have occurred between Q4 2019 and Q1 2020, to highlight, you can see the $15.6 million drop, given the lower TCE rates that Iain referred to, one vessel being withdrawn from service to go into conversion, offset by an increase of utilization rate from 90% to 94%. And I'd point out that the TCE rate that we issued of 61,100 [Phonetic] is an improvement on '19 TCE rate [Indecipherable].

The point to note in this left-hand part of the chart is that we've been working away at costs and cost cutting, and you'll see administrative expenses are down. I'd say that, I think for many companies, COVID-19 has seen a reduction in administrative expenses, and we're working to see which of those cost savings become permanent and which are a function of the unusual times in which we find ourselves. The right-hand side of this page shows you, as I said, the evolution of Q1 2020 last 12 months EBITDA of $268 million as compared to the Q1 2019 last 12 months EBITDA [Indecipherable]. Again, that broadly -- I won't go through the different reasons, but if people have questions we will [Indecipherable].

If we turn now to the next page liquidity development for 2020. Golar [Phonetic] is currently facing liquidity constraints. We feel that one of the resilient nature of our business, that Iain referred to at the start, the stable EBITDA from Hilli and even within the shipping business. That is something that puts us in a more resilient place than many. But nonetheless, liquidity is a focus for everybody in the current environment. We imagine, therefore, it would be a focus of yours. So we wanted to set out an explicit detail how we see our liquidity having evolved over the quarter. And to be very clear with you that we anticipate, as we look for what we anticipate to be the current outcome for the remainder of the year, we feel liquidity is sufficient for our group needs. We don't feel the need to draw down on a specific additional facilities as others have done.

And let me spend a little bit of time going through this because this is obviously an important topic in the current environment for all companies. On the left-hand side, you can see the 31st of December 2019, our cash balance, $375 million, split between unrestricted cash and restricted cash. For those less familiar with the group, a certain portion of our cash is tied up with LTs, vessel financing and other bits and pieces, and we spread that out seperately [Phonetic].

During the quarter, we had operating cash flow of $86 million. That's defined at the back, and I'll spare you the detail. We had a net capex of minus 1, that is capex that we've spent less the debt drawn down to fund that capex, so minus 1 is what we haven't been spending capex. We have. Golar is very much a growth business that is building out assets, but we've netted that off against the drawdown. You'll see the debt service that remains reasonably stable for the quarter.

Then the two key movements to note, is during the quarter, we repaid $70 million out of $100 million balance outstanding on a margin line, leaving $30 million balance left at the end of the quarter. So that's a $70 million margin loan repayment. And in addition, for those of you who're familiar with the group, remember, we had a total return swap in place, which was part of the buyback program. That was unwound during the quarter, and that saw a repayment of $73 million. So we closed the quarter with $235 million in cash, split between restricted and unrestricted cash. For those of you who are interested, you'll see the reduction in restricted cash which is associated with the change in the total return swap that I just mentioned.

What about the remainder of 2020? Well, we are exploring three things, which we will describe at the end in terms of financing. We are looking at refinancing the existing $150 million bilateral loan, which is due in November '20, and the remaining $30 million balance outstanding on the margin loan that is due in August '20. We have plans for that. We're in detailed discussions with a number of banks. And we feel that, that refinancing is very much routine. One can never say everything -- we're not complacent in this current environment, but we see a positive about that outcome. Secondly, we want to pre-emptively focus on the refinancing of one of our vessels, Golar Steel, where the financing is maturing in January 2021. We had detailed discussions with a specific leasing company, and we have term sheets that are bouncing between us, and that is up for credit approval with them very, very shortly.

And then finally, you will have seen in the press release that there are two vessels where we've had approaches [Indecipherable] those vessels, [Indecipherable] companies, and we're opportunistically exploring discussions. And those discussions are both very well advanced. So it is fair to say, those three groups of refinancings are important. But we do feel that they are routine. And when we look at them alongside the anticipated capex and operating cash flow, that we feel we will earn, we feel we have sufficient funds for group needs. I would make the point that in the current environment, forecasting out much further is difficult in the current environment, but we have a fairly detailed approach to cash flow forecasting and a fairly conservative approach to how we stress test that against shipping rates.

So with that, as a conclusion, I apologize for the detail. But in the current environment, we thought it was important to be significant and clear. Let me turn back to Iain now to take you through the division-by-division review.

Iain Ross -- Chief Executive Officer

Thank you, Callum. Turning to Slide 9 on the deck and shipping. Our revised shipping strategy that we've been discussing with you now for many quarters is contributing well, we think, to our improving TCE and shipping growth story, resulting in that quarter-on-quarter growth from 39,000 a day in Q1 '19 to 62,000 a day this quarter. And you can see the adjusted EBITDA profile on the graph, together with the utilization wrap up and that's clearly part of this strategy.

Q1 has had quite a cocktail of pressures on the shipping market. In addition to seasonal downturn, we've seen demand destruction caused by COVID-19 and oil price linkage, leading to LNG spot price dropping to around $2 million per MMBTU at the end of the quarter and with some cargoes canceled in the quarter, mostly from the US and more cancellations to follow during Q2 in the summer months. An effect of these items are a reduction of ton miles and less structural tightness in the sector than we originally thought. Spot rates fell from a high of 137,000 [Phonetic] in October to low to mid-40s by the end of March. Now offsetting this is some new production coming up from the US and the potential for deferral of noncommitted vessel deliveries over the next couple of years. Industry analysts are now forecasting that 2020 LNG production will be between 1% and 3% higher than 2019, so similar profile.

And finally, we have the eligible curve for Asian delivery, currently in angle toward the fourth quarter, and that may justify some floating production and an associated pickup in rates. You can see from the graphs on Slide 10 that we continue to grow shipping revenue backlog and lock in utilization for the year. If we compare the current position with 12 months ago, we can see that we have 6 times as much revenue in backlog over this time last year. And with the current market volatility, we believe this approach will help insulate us from a further downturn in the shipping rates over the coming months, while having enough spot capacity to enjoy the upside as and when it comes through. We expect Q2 TCE to be around $40,000 per day. If we spend over the last few minutes talking about how lower LNG prices are impacting the shipping market, and let's turn now and talk about how lower LNG prices create upside for Golar in the segments.

Turning now to Slide 12 and the current LNG market. Two points to make from this slide. Firstly, with all of the FID deferrals of newbuild projects that we're seeing, particularly at onshore sites in the US Gulf Coast, we believe the industry will reach a point where some projects will go ahead, but only those that have the right combination of gas supply, gas total cost, offtake agreement, liquefaction to capex, volume and speed to market. The challenge of many of these larger US Gulf Coast projects is that need huge volume into production to generate capex economies of scale. And with FLNG, we can deliver world-class liquefaction costs with a relatively small volume and in the shortest time between FID and the first cargo, with remote building and an Asian ship [Indecipherable] and therefore, minimal impact in permitting to pure. As the cycle moves back toward supply increases, we believe our proven FLNG units will be at the front of the queue.

The second point relates to LNG as a substitution. It's core to our downstream business in Golar Power. If you look at the tables on the bottom of Slide 12 and compare any of the cost per MMBTU equivalent, you can see the impact of the global reduction in coal, oil, diesel and LNG pricing over the last few months. And not only is LNG proving to be cheaper and cleaner that of even diesel for power generation and transport, but it's catching up to coal in Europe and is beating pipeline gas in China.

So how do we benefit from this? And let's turn to Slide 13 and FLNG performance. Our FLNG unit, Hilli Episeyo, offshore Cameroon has delivered another steady performance in quarterly EBITDA. We're currently offloading the 39th cargo. The message on Hilli is simple. It's reliably producing LNG combination, generating cash consistently. We haven't missed a single cargo and we're generating the most comprehensive operating experience of any foreign LNG company in the world.

And let's move to Gimi conversion project on Slide 15 [Phonetic]. You can see a nice picture of Gimi in -- dry dock, I think last quarter, we showed the rust steeled lady heading toward the dry dock, and now you can see she's nice and painted. As previously advised, our customer with a 20 year FLNG lease and operating agreement, BP, served Golar with an FM delay claim as a result of coronavirus impact around the globe. BP maintains that the delay is still in the order of one year, and Golar continues to engage in clarification and active dialogue on this subject, and are with steady discussions remain confidential at this time. But I've got three brief points to make in Gimi.

First point, as I said, we remain in active discussion with BP on this matter. Secondly, we're in advanced and positive discussions with our partner and our major contractors on a potential reschedule [Indecipherable] that takes into account the deferral of work and associated capital milestone payments. Thirdly, if this delay is implemented, it will result in a substantially derisked project from a schedule point of view and an improved liquidity position on the project through 2022, with the final outcome and financial consequence of the delay dependent on the ultimate duration of that delay and cause of the delay claimed by BP.

On the FLNG pipeline, while nothing is clearly going to crystallize in the short-term, we're still engaging with several companies around specific projects for both our Mark I design and our Mark II newbuild, which is shaping up to be equally as competitive as Mark I. We think this continued interest in our FLNG experience will position us well for the future.

Turning now to downstream, Slide 16, and Golar Power's progress over the quarter. So we celebrated the commercial operations of Sergipe plant on the 21st of March, which sees the commencement of the 25 year PPA with capacity payments now started. Concurrent with the plant reaching COD, [Indecipherable] plant operator has now commenced payment for charter hire of the Golar [Indecipherable] to Golar Power. Back to the 21st of March and throughout the quarter, the power station was generating electricity during commissioning. And when we add the three days of dispatch and at the end of March, we ended up the quarter with having produced just under 400,000 megawatt hours of power and a plant utilization factor of 12%, which price realized for all power generated was just BRL740 per megawatt hour. So the plant on the Episeyo generating base EBITDA for Golar Power. But what else can we do right now to generate more income from Sergipe?

Turning to Slide 17. We have on the left-hand side region of Brazil, and that's a region that Sergipe sits in, that met order for thermal power plants. The orange bars are the CDU are spot price and the blue bars show the capacity. And as you can see, Sergipe is right at the top. And that means that we're not called to dispatch. It is the most competitive -- cost-competitive thermal power plant, and we'll have the greatest opportunity to create income from the merchant power. It's important to remember that the PPA requests [Indecipherable] data prior to dispatch, which means that it will clearly be times when Sergipe is free to generate merchant power.

Half of the page, we show a graph of the spot electricity prices against time over the last couple of years. And we can see the sector cyclic, the higher spot prices typically running from May through October and a small blip in January and February. The green line is the plant breakeven based on contracted dispatch. But the red line shows the breakeven spot price that must be achieved for the plant in merchant mode assuming, in this case, we put an LNG purchase price of $3 per MMBTU. And as you can see, there are many times in the year that running Sergipe in merchant board will be profitable. And in actual fact, that $3 is probably a bit high as we talked about earlier, and the government [Phonetic] was even lower.

Just to give you an example of how profitable the table below illustrates the potential EBITDA for burning a cargo of LNG through the power station, and that takes about 15 days. So for example, if the cargo is purchased at $2.50 and the prevailing electricity price is BRL300 per megawatt hour, then this cargo, burning the whole cargo would generate around $20 million that is on top of the capacity-based payments. What else for Sergipe? Well, in addition, Golar Power started the process for the installation of the gas pipeline that will connect FSI new unit to the regional gas network, and we've commenced the customer acquisition process for that.

Slide 18 is a reminder of our small-scale LNG hub-and-spoke strategy. It starts with an FSRU hub located at the terminal. And from this hub, we made three spokes of channels to market. The first is from the FSRU to shore via gas pipeline to a large industrial customer of gas or a power station. This is generally the anchor customer that underpins the initial investment in the terminal. And what we've done at Sergipe is [Technical Issues]. The second is to break bulk from the FSRU into small-scale LNG vessels and transport it into neighboring geographies for further distribution to midsized or smaller scale customers. And the third is by putting LNG directly into ISO containers and moving them by truck or barge to secondary users deep in land but there's no current connection to gas pipeline or reticulation and whether opportunity is there to displace more polluting and expensive fuels with gas.

So turning to Slide 19 for an update on the development of the next terminal at Barcarena and our progress on small scale. At Barcarena, Golar Power continues to make good progress with EPC contractors and equipment suppliers concurrent with offtake discussions. Permitting has been slowed down a bit. However, the project does remain on track for a scheduled FID for the terminal before the end of this year. The FID in the power station is likely to be around the middle of 2021. We're also making good progress on the potential for an FSU to be located at Suape and permitting progresses as well for the terminal at Santa Catarina. We continue to look at other international locations that will may be suitable to replicate this model.

Our partnership with BR is an important channel from the FSRUs into the target customers. BR has 95 supply bases, 7,600 fuel stations throughout the country, and that relationship and its associated planning is progressing well. And again, in small scale, slow down a little bit, once more by COVID-19. We've purchased a commitment with three customers and a committed vote of 113,000 cubic meters per day of [Indecipherable] It's a small start but an important one that we feel proves out the model. Total capex for the three customers is around $8 million, and we will be generating $7 million in EBITDA in 2021.

In addition, we're currently negotiating costs with a further 21 customers associated with 600,000 cubic meters of the gas per day and similar economics. And importantly, we're discussing with around 200 more customers. We've already signed an LOI relating to a further 6 million cubic meters of gas per day. Whilst the COVID-19 is slowing the team down a bit, we're now making real progress in small scale. It's a low capex, fast payback business that's economically attractive for customers, while of course helping clean up the planet. We think this is a good story and so do others. Whilst we have nothing concrete as yet, we are receiving interest from potential strategic partners that we can potentially work with to accelerate the Golar Power growth story, particularly outside Brazil.

So if we turn to Slide 21 now, highlighting the launch of our first ESG report, which is web based and details our progress today on our five key focus areas: health and security, environmental impact, energy efficiency and innovation, people and community and governance and business ethics. [Indecipherable] commenced from the board of [Indecipherable] plan, and we look forward to having further discussions on the topic in due course.

So winding up and summarizing our priorities on Slide 22. We will continue to derisk shipping. In FLNG, our focus is to conclude the position on Gimi and to continue to progress discussion for potential expansion and extension of Hilli. In downstream, we'll continue to push the buildout of small-scale and develop the terminal at Barcarena. We'll focus on concluding the refinancing activities that Callum discussed. And of course, we'll continue to push for a sustainable reduction in G&A and simplification of group structure.

With that, I'd like to hand you back to the operator for Q&A.

Questions and Answers:

Operator

Ladies and gentlemen, we will now begin the question-and-answer session. [Operator Instructions] Our first question comes from the line of Ken Hoexter. Your line is now open.

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

Great. Good morning, Iain. And Callum, welcome. So Iain, just -- obviously, I think the one to start on is your thoughts and progress on the shipping spin, if there's any update on your thoughts. Is that just off the table in this market and kind of you just proceed as planned? And then your view of the mix now, you've improved -- you noted the amount that's contracted versus spot. What's your thoughts on increasing that in this environment where rates are today? Or do you kind of like the mix of almost 50-50?

Iain Ross -- Chief Executive Officer

So first question, nothing's happening immediately around the shipping spin. But the fourth -- the final point I made in the summary relates to that good old test of group corporate simplification. So we haven't given up. We continue to explore different ways to make the company comprised of separately investable components as we've discussed previously around the difference between shipping FLNG and Golar power. We continue down that path, and we'll update you when we've got something concrete to discuss on that point.

Around shipping, I think from our point of view, we like the structure that we've got, we like the profile that we've developed. I think we're building a defensive strategy across the portfolio that we want to protect [Indecipherable] and leaving that opportunity for the upside, whether that's through a contract structure or a couple of spot ships just to take advantage of any upside. So in doing that, we are happy to take on more term business as it comes along. Obviously, doing that in a very low-priced environment is more tricky than [Indecipherable] is on the like, but I'm just very pleased with the progress that our shipping teams made, particularly with the additional analysis that we're doing and using this to position. So the short answer to your question is that I would like to see a bit more of contracted term business. And certainly, I think compared to where we were a year ago, we're great and improved on our reach.

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

And then just following up on the Gimi, I'm sure you're limited in what you're able to talk through, but maybe you can just walk us through the process. Is it something that you move toward arbitration? Is there any court system that you've progressed with? Or does it just say at customer discussion levels and proceed from there?

Iain Ross -- Chief Executive Officer

All right. So yes, you're right. We have a process. Under the term, so that the lease of the agreement, we have a process to follow that determines causing remedy of any close to the event. So that process is under way. And importantly, it's expressly defined in the LOA. It's a complex process, so I'm sorry, I can't see anything more on the detail. We will give a full explanation of where we end up when we've got it formally agreed with both BP and [Indecipherable].

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

All right. I think that's helpful to know that there is a defined process in the agreement. Okay.

Iain Ross -- Chief Executive Officer

Absolutely.

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

And then my last one is just on Brazil, right? I mean, obviously, so many different parts of -- moving parts here. But when you think about the process and the bid, maybe you can just maybe simplify the bid process for the next steps, whether it's in Barcarena or are there other bids that you're looking at to expand your capacity there?

Iain Ross -- Chief Executive Officer

Yes. So yes. We already have 600-megawatt power station that we've bid and been awarded for the Barcarena. We continue to develop the terminals and the other locations that I mentioned. And the process is, I mean, Brazil is obviously going to be delayed with any options right now. You don't want to go down there with COVID-19. The process is quite simple. An option is declared by the government. As we get closer, we understand the number of megawatts, and therefore, how competitive we can be. And we've got -- it's a GPA extension. We've got -- Barcarena is an already awarded [Technical Issues] other places. And the idea is that we work out where we can be competitive and embed into that process using the best combination that we can come up with. I think these awards can also be swapped around afterwards. It's quite a -- it's -- in one way, it's a very, very strict and regimented process.

And on the other hand, once you have been awarded, you can move some of these projects around. The key to success here is the fundamental point of having locations ready to bid that are approved and qualified. That's where all the hard work goes on in the background, getting these locations ready. We've got many that we're working on to be able to do that.

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

And let me just wrap up, I guess, on the LNG price environment. When -- where prices are now, do you expect, as we see the reopening obviously creeping up in the US and Europe, accelerating a little bit more, and clearly, in Asia, I think we've seen a bigger ramp up. Are you expecting that pricing just to follow a normal seasonal pattern? Would you expect to see a slow uptick based on the acceleration of the reopenings around the world? Maybe you could just kind of walk through that. And I appreciate the time. Thanks.

Iain Ross -- Chief Executive Officer

My look at LNG pricing and shipping is probably the same as everyone else is, it's wrong. I mean if you can tell me when the global recovery is going to restart, what the rebound profile will look like, how that has translated to energy demand, what oral demand will be? How will OPEC plus in the US shale will respond? How the coal expect between Australia and China that's been recently announced to play out. Trade delays in LNG between the US and China, then I have a more informed view, getting delays in defensive strategy in order to create resilience. And with LNG, we're developing our Mark III, so it's super competitive and staying engaged with customers. And I think that -- it's all we can really do, we're trying to forecast this. This is not forecasted to be prepared and be ready to move as soon as the opportunity arises.

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

Wonderful. Appreciate the time. Thanks, Iain.

Iain Ross -- Chief Executive Officer

Thanks, Ken.

Operator

Okay. Our next question comes from the line of Randy Giveans. Your line is now open.

Randall Giveans -- Jefferies -- Analyst

Hi gentlemen, how is it going?

Iain Ross -- Chief Executive Officer

Hey Randy.

Randall Giveans -- Jefferies -- Analyst

So yes, first, congrats on starting the Sergipe power plant during the first quarter. Just kind of following up on that, what are the expectations for the cash flow ramp up? And how has that Brazilian real depreciation impact of this project? It seemed like initially, the EBITDA contribution was around $24 million a quarter. It looks like now, it's closer to $19 million a quarter. Is that a good kind of run rate for the remainder of 2020?

Iain Ross -- Chief Executive Officer

Well, it's dominated by -- it's influenced by two things. Obviously, the real exchange rate, so all our costs and the majority of our debts in reals, so there's a bit of a natural hedge there. But then the other thing that happens, of course, is it's linked as all Brazilian contracts are as we go through the year. So you get some degree of offsetting of one against the other. I don't have in front of me the indexation that we've got coming up.

Randall Giveans -- Jefferies -- Analyst

Okay. But the kind of reduction in the debt servicing and interest could offset the reduction in the revenue contribution. Is that fair?

Iain Ross -- Chief Executive Officer

Yes. I mean the debt service and interest is all -- majority of its denominated in Brazilian reals. There's no impact there. The only pay impact is what comes out the other end as distributable cash, if you like, and how you convert it and where you're going to spend it.

Randall Giveans -- Jefferies -- Analyst

Okay. And then looking at FLNG, I know you already mentioned a little bit about the process being under way. Do you have some kind of a time line for that? Is that a few weeks? Is it a few months? And then switching over to the Hilli, any updates or kind of ongoing talks with Perenco to either extend the contract on Trains 1 and 2, start utilizing Train 3? And maybe what's more likely, I guess, in your opinion? An extension or an expansion?

Iain Ross -- Chief Executive Officer

So I don't know anything else. It's -- there's no point -- I think we're in a very structured, organized process with BP that we're progressing, and we'll update everyone over out the other end of that. I don't know if you're referring to the article that popped up yesterday around Hilli. We obviously don't comment on media speculation. Look, the fact is we've got a great operating relationship with Perenco. And we've never stopped having commercial discussions with them around potential for both throughput expansion with the existing contract, that's got six years left to run, and equally for the potential to extend that beyond six years. And I figure out that Perenco is an oil company. In the current environment, we would expect them to be prudent with capex and cash conservation.

So while we understand that the drilling investment to provide more gas into the current contract is relatively small, I'd expect a bit of delay there due to the current environment. About the extension, we maintained the position. It would seem to make sense for both Perenco and SNH to continue with Hilli due to the gas that stands available in Cameroon Waters. And we'll continue to have commercial dialogue in that regard in the meantime, and importantly, we'll press on with ensuring that Hilli continues to be the best-performing LNG project in operation today.

Randall Giveans -- Jefferies -- Analyst

Got it. Okay. I just wanted to see if there are any updates there on Perenco. And then I guess one question for Callum. First, welcome to the big show here. And no need to apologize for the detailed financial explanations as you did earlier. We like that. So looking at those multiple refinancings that you were referring to, obviously, you're diving right in with all this work under way. What is the kind of the possible net liquidity increase you expect after repaying the current debt on these kind of refinancings?

Callum Mitchell-Thomson -- Chief Financial Officer

So thanks for the question, Randy. [Technical Issues] which you probably haven't had a chance. There's a little bit at the back end, where we talked about what the vessels are. It depends what we do, right? If you look at the field, that is a requirement. We want to be on the front foot and then have that done prior to January. So I think the extra liquidity on that, you should think of that as being low. That's heading off the potential put option from the counterparty in January next year.

So think of that as being low single -- mid-single digits in terms of liquidity gain. Then the liquidity gain from the other assets that we referred to, it depends on which ones we choose to do. We've got three potential situations that we are looking at. We are in very advanced discussions with the counterparties in terms of term sheets, credit committees, etc. I think you should think of that -- the liquidity gain, well, all three to -- but all three to occur, you should look at the liquidity gain being north of $50 million and sub $100 million. You should think of it in that zone. But I must stress that this is opportunistic. People have approached us and said, we think this is good for you and we think we're interested in this, and we're looking at it. We're in advanced stages, so things should -- you never know in the current environment, things should move quickly. But from those, you should be looking at between $50 million, 50, and $100 million were they to occur. But please note the -- were they to occur.

Randall Giveans -- Jefferies -- Analyst

Yeah, that's fair just trying to see what kind of levers you could pull there. But thank you for that color. Good to talking with you.

Iain Ross -- Chief Executive Officer

Thanks, Randy.

Operator

Okay. Our next question comes from the line of Michael Webber. Your line is now open.

Michael Webber -- Webber Research & Advisory -- Analyst

Hey good morning guys, how are you?

Iain Ross -- Chief Executive Officer

Hey, Mike.

Callum Mitchell-Thomson -- Chief Financial Officer

Hey, Mike.

Michael Webber -- Webber Research & Advisory -- Analyst

Hey, Iain, first one is on the Gimi. And I know there's an ongoing process with BP. Just thinking from your perspective and the actual conversion work being done in Gimi, is there -- what, if any, impact should we expect on these -- the leverage in the syndicated debt associated with that asset as it relates to some degree of schedule relief with the force majeure? I know BP mentioned a year, which is an oddly specific number for someone that's simply looking to sell the gas. But the -- does that have any impact? I know the first piece is syndicated debt in the FLNG market ever, I think. So is there any repercussions or any pockets of concern associated with those overlapping processes?

Iain Ross -- Chief Executive Officer

I'll let Callum chip in on this to start with.

Callum Mitchell-Thomson -- Chief Financial Officer

Yeah, sure. I think the -- I think we've been delighted with, Mike, on how our lenders have responded. They get the situation. They understand it. We're keeping them informed. It's a fast-moving situation. We're trying to move three, [Indecipherable] sort of parts of the side of a triangle off to the right. The BP discussions, the contraction discussions and the financing side. As they currently stand, I think it's fair to say we're comfortable with where we are. We think the short answer to your question is, no, we don't think there are any repercussions for the financing by moving the financing to the right in terms of the comfort of the lenders.

I think they've been very supportive, and we're appreciative of that. They're obviously waiting, the process there, it's for us to have a final -- for us to be able to take the advanced and positive discussions we have with the contractors. Price will add up, cost all that up, phase it and then go back to the lenders and their engineers and say, here's where we're at. Are you OK? And the initial conversations we've had with them around is a dynamic, right. We have to be better than the contractors. We keep the lenders informed. The environment is positive. We had said that at the start, right. We haven't we've got a little bit of a way to go to get this finalized, but it's advanced and positive. So there's a bit more color around it. But at the moment, we think they're along with us and are super supportive.

Michael Webber -- Webber Research & Advisory -- Analyst

Got you. And without getting too granular, if I think about the 12-month term reference by BP, that doesn't trip any -- there's no -- it don't trigger anything within the credit documents, the indenture associated with the availability of that capital? I know it doesn't start amortizing until, I believe, commercial delivery? I've got to check. But the -- there's no -- there's nothing -- I don't think it's triggered but within -- just from the time frame alone. Is there anything?

Callum Mitchell-Thomson -- Chief Financial Officer

I've asked that question, Mike, and the answer I've got is no. It does not.

Michael Webber -- Webber Research & Advisory -- Analyst

Okay. Okay.

Callum Mitchell-Thomson -- Chief Financial Officer

There are other things we care about -- well, there are other things we care about in terms of quantum and tone and everything else. But in terms of duration, no.

Michael Webber -- Webber Research & Advisory -- Analyst

Okay. That's helpful. I appreciate it. The -- Iain, on the carriers, again, I know this is in the process that's been going on for close to two years now, I think, maybe more. We've kind of gone full circle. It's a difficult proposition. In fact, I can't think of another time where you've seen that size of -- a block of carriers that size, changed hands, maybe the Teekay deal with Marubeni. But -- and even now, it's probably smaller. Is the most likely scenario -- given what we're looking at now, is it fair to say the most likely scenario is some kind of in-house solution -- that [Indecipherable] doesn't necessarily involve unrelated third parties?

Iain Ross -- Chief Executive Officer

It could be. We're considering all options, Mike. I mean first of all, our frustration, this is fairly big in that we had the original spin-off with this three -- two other shipping companies thwarted at the end of last year. That spin-off that was thwarted by the global downturn that we have. We're not giving up. We'll get it sorted. We just haven't quite landed on the right solution for this time. And we're exploring new options. Callum has come in with some great new ideas. And we -- and I'm confident we're going to get that [Technical Issues] on it. And I'm so happy that I haven't been more specific about what it would look like because these things have, in the past, have been wrong.

So really, we're still [Technical Issues] on it, and we've got it there on our list of priorities. It's really just to let you know that we're not giving up. We understand the value of having an investable vehicle that is -- and having investable vehicles and other things. And you get different types of people to invest in those different asset classes, but we're just trying to get it right.

Michael Webber -- Webber Research & Advisory -- Analyst

Got you, OK. On the Hilli, and I know you kind of guided this earlier, and I believe, previously, you've mentioned the preference to extend relative to expanding. I'm sure both would be preferable. But if you could pick one or the other, extending the term and eliminating rollover risk versus adding a third or fourth train is your preference? Is that the right way to think about it in terms of the most likely outcomes?

I know there's a bit of horse trading going on between Perenco and the government. Anytime we see articles like that, that's -- they're written for a reason by someone to send a message. But should we think of it as -- is the most likely scenario an either or? Or do you think it's likely that we would see something eventually combined where Perenco has done some more drilling?

Iain Ross -- Chief Executive Officer

Well, they could be step-wise. We might get a bit more production coming in within the six-year contract -- sorry, the eight-year contract and we have six years left. So we might get that. But then we have a period of a couple of years to then agree an extension. So if you take the premise that it's assuming that LNG prices all -- somewhere a little bit more attractive than they currently are. And remember that some of this gas is a byproduct, they have condensate-rich fields, so not just the pure gas for Perenco.

If you think about the extension opportunity being attractive to Perenco and SNH, then you would then conclude that in their interest to talk to us about an extension and try to do something over the next couple of years to nail that debt. But equally, and we shouldn't forget this. It is a fantastic reputation with all that operational knowledge that we're building up. And it's -- in two years' time, and four years after that, it will be very good to be deployed sometime -- we already [Technical Issues] interest coming from other parties to say, can we have a look at setting something up, so that we could [Technical Issues].

I don't think your statement is right about, it's our preference just to extend it. My preference now is to get additional volume through as much as we possibly can now because it's cash today for no incremental capex. Sure, we want to extend it, assuming we get the right deal from Perenco and SNH. And if we can't extend it with the right deal, a bit of a grand swell of interest that we can explore over the next couple of years to see if we've got something that might be better.

Michael Webber -- Webber Research & Advisory -- Analyst

Okay. That's fair. And you maybe touched on this, just one more for me. You touched on Brazil quite a bit, but maybe just to kind of put a point on it. The impact of COVID on the pilot programs you're running in Brazil, I know there's been a lot of interest, and you've got a number of people kind of sign up for MOUs.

And is that -- to what degree has that appreciably extended the time line for initial commercialization of that kind of, call it, kind of the merchant share of capacity that you have in Brazil? And my apologies if you referenced that in you prepared remarks and I missed it. But to what extent, if you can maybe measure it in quarters, do you think that kind of slides your time line back in terms of how you think about commercializing the process?

Iain Ross -- Chief Executive Officer

Well, it's a fair question. So -- and the answer is, I don't know exactly. But we've been talking for a while about converting some of these LOIs that we've had into binding agreements, if you like. And we got our first three under, so 115,000 cubic meters of gas per day. I think that starts the ball rolling. It's giving the team confidence around the economics. We've got the deals done, payback in a ready year. EBITDA, capex, one, capex EBITDA rather than one. I think at the end, what we're going to trying to report progress.

It's been three customers now, one in negotiation, so they should be converted relatively in short order. Then let's see how we go against that. And then another 200 have signed up to LOAs -- LOIs, rather, representing 6 million. So if you add all that together, it's something like 1.5 million tons of LNG per year, so it's a phenomenal volume.

But to answer your question more directly, we've got three down. Let's see where we go through quarter two, and let's see how that curve starts to ramp up. And I envisage it being a slow start. And then as we get in better and better in rolling these in, we will get more confidence. The customers will have analogs to go by in terms of, yeah, other people have done this, and I think it will speed up. But yeah, we've taken a little bit of hit in time for the delay in Brazil. I don't think it's over at Brazil yet as well. So let's see how we go next quarter.

Michael Webber -- Webber Research & Advisory -- Analyst

Okay, perfect. Thanks for the time guys. Appreciate it.

Operator

Okay. Our next question comes from the line of Chris Wetherbee. Your line is now open.

James Monigan -- Citigroup -- Analyst

Hey guys, James on for Chris. Just wanted to touch on the Sergipe power plant. Exactly how many days so far in 2Q has it actually been on call? And how should we really think about utilization? And then sort of, separately, I was wondering if you could think about the merchant power opportunity there across the balance of this year, just given COVID and basically the broader slowdown. Just want to sort of get a better understanding of the outlook there.

Iain Ross -- Chief Executive Officer

Yeah. So remember, we came on in Q1 -- so we're reporting Q1 numbers. Now Q1 came onstream 21st of March. And in that period, if we engaged the last three days of the month that we were called to dispatch. And prior to that, it was commissioning. So the numbers of 400,000 megawatt hours relates to a combination of the hours dispatched under the PPA. So it was basically three days. And the hours is doing commissioning, which, I guess, is a form of merchant power, but it wasn't done in an economic, it was done because we had to run the machines.

Now while Q2 will be the first full period of availability for merchant power, it won't be truly representative, I don't think, of the earning capacity of the plant because we're still performing some additional guarantee and performance test with the contractor as part of the agreed program. So the focus, as I think about it, the focus was getting commercial acceptance, which we've done. And that develop [Technical Issues] and we've got a few other tests of things to tidy up as we go through.

But nevertheless, there should still be some opportunity for merchant power in the quarter as the prices comes -- come up. And then I think we'll see the third quarter being more representative of what we could probably do. And fourth quarter, I would expect there's a little blip in the year, but I expect that will come off as well. And this is dominated, absolutely, by the availability of hydropower because these plants have recalled us back. Obviously, they turn to thermal plants when hydropower isn't available due to the reservoir levels. So we've got a team in Brazil that are -- I think we had a weather forecast. We are so connected into the weather forecasting and a little in the dams to be able to predict ourselves. And we think we might be called for dispatch so that we can obviously line up whatever it is that we're going to do around LNG shipments and the like.

James Monigan -- Citigroup -- Analyst

Okay, that's helpful. And then also, you mentioned the possibility of pipeline gas. Just wanted to get an understanding of sort of the timing and sort of EBITDA potential from that particular opportunity in Brazil as well.

Iain Ross -- Chief Executive Officer

So the timing of the product stage, like stock on pilot. I'm thinking from memory, it's about 20 kilometers or something like that. So the timing would probably -- we might be able to take FID on that later this year or early next year. It just depends on how quickly we can get these permits processed. That's the thing that's probably been slowed down the most through the COVID-19 issues, that permitting process. So we'll happily give you an update on that a little bit later after we've gone through that.

And EBITDA, we know that it's a relatively low capex, potentially a good EBITDA generator. We've just hired a team, and we've just started that commercial acquisition process of getting industrial customers on. So -- and it's OK. Let us go through this quarter and press through an update on that next time in terms of where we are and the actual EBITDA. Unless, Callum, you've got any insight into the EBITDA numbers that potential from that pipeline. Obviously, we wouldn't be doing it if it wasn't a low capex, fast return opportunity.

Callum Mitchell-Thomson -- Chief Financial Officer

I think that's right. That's unique, team that's working, they tend to sign up customers on a sort of with a base guaranteed fee and upside share. So you should think of it as the revenue split being between a base and then have to depending on commodity price differentials. But in fact also, here and you respect that and value it before that translates into giving you guys, we'd like to present see how it works. But it looks -- it looks very exciting. But we do need to feel confident we can -- we have a good handle on it. At this stage, it's positive, but let's see.

James Monigan -- Citigroup -- Analyst

Fair enough. I'll leave it there.

Iain Ross -- Chief Executive Officer

Thanks, James.

Operator

Okay. Our next question comes from the line of Craig Shere. Your line is now open.

Craig Shere -- Tuohy Brothers -- Analyst

Good afternoon, and welcome to Callum.

Callum Mitchell-Thomson -- Chief Financial Officer

Hi, Craig.

Craig Shere -- Tuohy Brothers -- Analyst

Iain, you noted Golar's low cost FLNG development strategy. We certainly agree with that. But the primary challenge has been not engineering or construction, but really financings that are matched the underlying contract duration. Previously, you've cited financing improvement opportunities in terms of better shipyard terms, infrastructure equity partners and better debt financings. Can you provide an update on these efforts?

Iain Ross -- Chief Executive Officer

We're still going, Craig, in the same direction. So obviously, there are opportunities for the new build. They're bigger. They're more expensive. But they're very competitive in terms of capital cost per ton. And we will be targeting those customers that -- they obviously have a good security around any potential deal that would result in financing, or they can actually be part of the project. There would be such -- there'll be fairly large projects.

But I think it's early days, Craig. I mean we've very much positioning. Nothing is happening, specifically, around anything close to FID on FLNG projects. What we are doing is we've made very good progress on our Mark III design. This whole economic turmoil that we're going through has put everything on pause a little bit. But I guess the message I want to give out is that we're not -- we're continuing to develop our Mark III design. We're continuing to stay in touch with customers. In fact, we're having virtual meetings all the time through our FLNG development team to keep these opportunities warm. My final point on is it when the market is ready to address -- in surplus at the moment, but when we go into deficit and people can see demand pooling, requirement for more supply, we will definitely be in the front of the queue.

Craig Shere -- Tuohy Brothers -- Analyst

Very good. And speaking of FLNG, I apologize, I know there's a lot already been asked. On the BP Gimi force majeure, would it be fair to say that there's no reason to think that this could extend beyond the initially claimed one year delay. It could well result in probably less than a one year delay? And could we get better color on this -- the extent of the delay potentially by the 2Q call? And would any cost overruns that are associated with the delay necessarily be 100% equity funded? And do you have any rough range of how much those cost overruns could be?

Iain Ross -- Chief Executive Officer

They are all perfectly sensible questions, but I'm not going to answer any of those. The -- we're going through the process. Obviously, we'll give an update where we are in Q2. If we sold things by the end of that, then we'll do so. But as much as I'd like to explain more, our confidentiality agreement precludes us from even talking about any -- on where we're going. That's just the way and we respect, fine, and we continue our discussions as we go through the process.

Craig Shere -- Tuohy Brothers -- Analyst

Fair enough. Sticking with -- last question, sticking with FLNG. I just want to clarify [Phonetic]. I believe your Perenco-Hilli contract was specifically 500 bcf, that with two trains would run eight years, but they could tap a third train and do it more quickly. My question is, if they don't tap Hilli at all for a time, would they then be able to tap that third train under the existing contract to stay within the eight-year time line?

Iain Ross -- Chief Executive Officer

So we've had a few backwards and forwards on this with Perenco. I think we all have a common desire to have that contract, an eight-year contract and less about the 500 just because we've got a little bit more -- we've had 1.5 years of experience of working on the -- this project, working up to two years experience now of working on the project. So you should think about it as an eight-year contract, and whatever volume we can put through that, it's up to Perenco and SNH to put the necessary changes to any trade agreements to allow that to happen. But I think the desire is to have an eight-year contract. And let's not worry so much of about 500, if that makes sense.

Craig Shere -- Tuohy Brothers -- Analyst

I see. So back to your point before, you'd rather maximize volume today, so to speak, understanding that it won't be maximized in the next couple of quarters. They could start tapping the third train. And if eventually, we get better markets and they want to upsize their oil production and associated gas. Then you can discuss about tapping the fourth train down the road?

Iain Ross -- Chief Executive Officer

Yeah. All of the above is possible. And I'm talking about Hilli, once something's signed, we'll talk about it publicly.

Craig Shere -- Tuohy Brothers -- Analyst

Okay. Thank you very much.

Iain Ross -- Chief Executive Officer

Thanks, Craig.

Operator

Okay. Our next question comes from the line of Greg Lewis. Your line is now open.

Greg Lewis -- Credit Suisse -- Analyst

Yes. Thank you and good afternoon everybody.

Iain Ross -- Chief Executive Officer

Hello, Greg.

Callum Mitchell-Thomson -- Chief Financial Officer

Hey, Greg.

Greg Lewis -- Credit Suisse -- Analyst

Iain, could you talk a little bit about Golar Power? I mean, clearly, as you look at this opportunity in the small-scale distribution, there's a lot happening. And maybe it pushes out a quarter or two, depending on issues surrounding that country on COVID-19. But as we think about the opportunities, and in the slides you talked about, I saw tanker trucks, some pipeline, other small-scale opportunities. Is there any way to think about maybe the capex around this to meet this growing demand as it kind of plays out? Just kind of -- I mean, it seems like a great opportunity. I mean is this just really free money, given that the infrastructure is in place? Or are there going to be any calls on additional capital to kind of build out this smaller scale network?

Iain Ross -- Chief Executive Officer

So there's no such thing as free money. This was us managing the across it. But in terms of how Golar Power will build this out, we have a very detailed plan. Obviously, it has a number of fronts. They weren't all addressed in accordance with plan, so that's -- we'll push ahead on the ones that we get the breakthrough as we can. The important point is that as far as we know and as far as the plans that we've seen going forward, all of the capex will be funded from within Golar Power.

So there's no additional equity requirement to come in that we're aware of. And that capex will come from a combination of income from Sergipe. And obviously, there's a [Technical Issues] owned by Golar Power and the potential for additional debt facilities that they have. So Golar Power is essentially at this stage in the development phase, self-sufficient for what has got in front of it.

Greg Lewis -- Credit Suisse -- Analyst

Okay, great. And then just a question around on slide 17, you have that interesting chart where you talk about the spot prices for power. I guess two questions around that. One is, clearly, we can see the price. Is there any way to kind of quantify realizing that it is going to be different on an annual basis? Is there -- but is there any way to think about the call on that demand, like in terms of megawatts, in terms of -- as we look at -- it looks like we're moving into a strong part of the year in Q2, Q3, whether spot prices move higher? Is there any way to think about what that potential capacity call could be to something like Sergipe?

Iain Ross -- Chief Executive Officer

So the table on the bottom of that slide 17 is kind of our -- the easy way to think about it. So noting that we've got 60 days notice for dispatches, basically two months. If we're not dispatched, we know that we have two months' worth of opportunity. And if you think about a cargo being burnt full cargo, so -- of LNG being burned over around 50 days, maybe 60 days. So if you have a think about how many 30 days in a 60-day period, between now and the end of the year, you feel that we might have the opportunity to burn LNG at a profitable rate.

And look at the -- the table basically shows, so if you look at the graph, you've got a peaking at 500 last year, we get 300 this year. Choose a number, R$200 per megawatt hour, and we buy LNG at $2 per MMBTU. We've got $12.7 million of EBITDA in profit. So it's really a case of having -- how many times that sort of thing can occur. The point that we're trying to make is there is a spread between the spot price that's called in the region and the fact that we were the most competitive plant that's out there. And therefore, if anyone has the opportunity to make margin on that merchant part of Sergipe.

Greg Lewis -- Credit Suisse -- Analyst

Okay, great. And then just one more for me. You kind of mentioned the global opportunity landscape for Golar Power. I mean, clearly, there's a lot for the Company to be doing in Brazil, and you're gaining a lot of traction there. But as we think about maybe the broader global opportunity set, I mean, how should we think about it? Clearly, Brazil is an emerging global economy with tons of access to support on a port access. Is that -- I mean, is that how we should be thinking about where the other opportunities could be? Just trying to understand, I mean, how we should be thinking about that opportunity set globally.

Iain Ross -- Chief Executive Officer

Look, I'm not going to name the countries, obviously. We want to have [Speech Overlap] if you think about countries, locations within countries where there's a population that doesn't have access to electricity or doesn't have access to clean energy, so it's currently burning dirty energy, and where an FSRU would be a fast solution and this model hub and spoke would work, then we have about 15 countries that we're working on right now. You're right, the focus is on Brazil. We've got to get that working. We've got Sergipe working. We start the rollout of the small scale, proving the economics of the model. And then we can work out how we transfer that.

And I mentioned in the past that we've had a bit of -- so a strategic interest, if you like, and people that -- they may want to partner with us to accelerate that. And the advantage we get with that is obviously, due to some of the -- some of those locations. Brazilian presence is very strong, and we're not naive to think that you can do everything out of one location. You've got to be kind of meta national about it. You've got to have people on the ground. Now whether that's with a local partner or teaming up with somebody that's already there, so that's the kind of process. So the focus is, firstly, to get Brazil up and running. Sergipe takes small scale, we started, but getting Barcarena done and look at how we're going to expand that and taking in partnerships as we go.

Greg Lewis -- Credit Suisse -- Analyst

Okay, perfect. Thank you for answering all my questions.

Operator

Okay. Our next question comes from the line of Jason Gabelman. Your line is now open.

Jason Gabelman -- Cowen and Company -- Analyst

Yeah. Hey, how is it going? I guess, yeah, just going back to the Brazil opportunity, you mentioned, I think a couple of quarters ago, you saw the potential to grow EBITDA in Brazil within Golar Power, your share by $100 million between now and 2025 in kind of a ratable fashion. Is that in line with the opportunity set that you still see? Or has that changed a bit?

Iain Ross -- Chief Executive Officer

It's probably -- what we talked about there was a very slow start-up, and I think we've proven that it's a very slow start-up, which has been hampered, obviously by the COVID-19 situation. But as I said previously, let us get a bit of progress through Q2 and Q3 on the run rate in converting these small-scale LOIs and demanding agreements, and we'll be able to update you on how fast that we're going. Obviously, when we get the Barcarena terminal FID done around by the end of the year, that will have an impact. So we can model all we want, but this is going to be determined by physical progress.

Jason Gabelman -- Cowen and Company -- Analyst

Got it. Okay. Thanks for that color. And then just switching gears to the MLP a little bit. Clearly, you made some moves to shore up liquidity there as well, but the debt payments that you had to, you were able to push out. Do you see a risk to the structure? Or I guess, a better way to phrase it is, how are you thinking about the MLP within the current structure? Is there an opportunity to restructure that subsidiary? And I believe there's some recourse debt at the MLP recourse to Golar, the C-Corp. Is that something that you're planning to potentially have to deal with down the road?

Iain Ross -- Chief Executive Officer

I guess there are two comments to make. One is, most of the questions, you'd be better off asking Callum at the MLP call on the half hour. But Callum, do you want to comment on any of the points?

Callum Mitchell-Thomson -- Chief Financial Officer

I'll just make the point, Jason, that -- I mean, certainly, I'm a month into this job, and I think a couple of your colleagues referred to the structure of the group and the MLP spend. I think what we intend to do, and Iain mentioned it, I'll just reinforce the point, is sort of sit down and look at the group as a whole and say, right, what's the right structure? What gives us the maximum flexibility? What's the right structure that gives us the maximum financing flexibility? And what's the right structure that meets the needs of equity holders and bondholders? And we're doing that.

And then we layer in, I think, one of your other colleagues talked about the carrier environment. We need to layer that in. That stuff that we're doing, we're doing a lot of thinking. We're doing a lot of modeling and a lot of work, and that will continue. I think it's premature to say which direction we'd go and what we would do, but it's something that we're absolutely looking at. And maybe the decision is status quo, I'm not sure. It's too soon to say, at least from my perspective, but it really is. If you think of the strategic questions, we've cut a lot about Brazil, but this is also one of them that's very important. So we noticed that there's a situation that we need to think hard about and we're thinking hard about it. And I wouldn't say anything more than that at this stage. So apologies that I can't. But when the time comes, where we have a plan and we think it works, we'll be very specific with you. But right now, we can't.

Jason Gabelman -- Cowen and Company -- Analyst

Okay. Understood. Thanks for the color.

Operator

Okay. Our next question comes from the line of Liam Burke. Your line is now open.

Liam Burke -- B.Riley FBR -- Analyst

Thank you, good afternoon. Iain, could you give me a little clarification on the discussion of the build-out of the small-scale LNG customers? You mentioned incremental capex on the project would be $8 million, and that would generate $7 million in annualized EBITDA. Is that the type of return you can expect from the entire project based on additional capex and then the additional 200 LOIs?

Iain Ross -- Chief Executive Officer

The short answer is we don't know, because we haven't done those deals yet. But think about it as ranging from maybe -- if you look at capex to EBITDA at 1 times to maybe 3 times, something like that. And I spread across the 2 million customers, it's a very small capex, fast payback business. But each customer is different, and obviously, dependent on where that customer is, how they're getting their analogy and what kit needs to be provided in order to get it there? That influences the cost of putting that sort of supply chain in.

So I would suggest, think about it between 1 times and 3 times as a range across those customers. That's what we feel at this time. And what we -- what I think we'll do is we'll update you as you go -- so as we go through the quarter. So quarter one, three customers, 21, negotiating, 200 and equating to 113,000 cubic meters of LNG, 600,000 and then up to among to 6 million, if we ever get there. And we'll -- and then we'll probably update you on the sort of the capex multiple and payback arrangement that we can come up with.

Liam Burke -- B.Riley FBR -- Analyst

Okay. Great. And on Golar Viking, is that project still on schedule?

Iain Ross -- Chief Executive Officer

[Technical Issues] Yeah, we had a bit of delay in the first part of the year. So it's a big converted yard in Hudong. And of course, China was hit pretty hard with the early stages of coronavirus. This -- back to Sergipe. So there may be a delay there. If there is, it's going to be relatively short. So there's -- and everything else on the project is on track. We lifted the main compressor module onto the ship last week or the week before. So it's going well and everyone is doing a great job.

Liam Burke -- B.Riley FBR -- Analyst

Great. Thank you, Iain.

Iain Ross -- Chief Executive Officer

Operator, we are going to have to wind up in the interest of time, I'm afraid.

Operator

Okay. That is it [Phonetic], sir.

Iain Ross -- Chief Executive Officer

Okay. So in closing, for me, I'd like to thank everyone for their participation and interest in Golar. We're certainly weathering the storm, and we think we've got exciting prospects for the future. So please stay safe. We look forward to talking to you next time. Thank you, and goodbye.

Callum Mitchell-Thomson -- Chief Financial Officer

Thank you.

Operator

[Operator Closing Remarks]

Duration: 76 minutes

Call participants:

Iain Ross -- Chief Executive Officer

Callum Mitchell-Thomson -- Chief Financial Officer

Ken Hoexter -- Bank of America Merrill Lynch -- Analyst

Randall Giveans -- Jefferies -- Analyst

Michael Webber -- Webber Research & Advisory -- Analyst

James Monigan -- Citigroup -- Analyst

Craig Shere -- Tuohy Brothers -- Analyst

Greg Lewis -- Credit Suisse -- Analyst

Jason Gabelman -- Cowen and Company -- Analyst

Liam Burke -- B.Riley FBR -- Analyst

More GLNG analysis

All earnings call transcripts

AlphaStreet Logo