Agnico Eagle Mines Ltd (AEM 1.06%)
Q4 2019 Earnings Call
Feb 14, 2020, 11:00 a.m. ET

Contents:

  • Prepared Remarks
  • Questions and Answers
  • Call Participants

Prepared Remarks:

Operator

Good morning, my name is Marcella, and I will be your conference operator today. At this time, I would like to welcome everyone to the Agnico Eagle Fourth Quarter Results 2019 Conference Call. [Operator Instructions]

Thank you. Mr. Sean Boyd, you may begin your conference.

Sean Boyd -- Vice Chairman and Chief Executive Officer

Thank you, operator, and good morning everyone and thank you for calling into our fourth quarter and full-year 2019 results conference call. Before we get into the slides, please be aware that this presentation includes forward-looking statements.

I'd like to begin by just summarizing 2019 and the fourth quarter. In the fourth quarter, we had record gold production, as we brought on the two new mines in Nunavut. We also have record cash generation in 2019. With that added production, we see 18% production growth from 2019 out to 2022, and will provide some details on that production growth in a minute.

Although we had a very strong 2019 and fourth quarter 2019, we still have some work to do in Nunavut through the first quarter of this year, as we ramp up those two newly built mines, so we'll also talk about that. When we look at the fourth quarter numbers in a bit more detail, we produced almost 500,000 ounces in the fourth quarter, which is record production. For the full year, we exceeded our full-year guidance, which has been increased during the year. We finished at 1.782 million ounces, at a total cash cost of $673 per ounce. Our unit costs in the fourth quarter were impacted by the slower-than-expected ramp up in Nunavut and we'll talk about the details as we said in a minute.

With the record cash generated from operations in 2019 and the ability to continue to grow production while generating free cash flow, our dividend was increased in the quarter to a quarterly rate of $0.20 a share. From the three-year guidance perspective, as we said, we've got production growing 18% off of the record production level in 2019. We should see cost decline in 2021, 2022. When we look at our 2020 guidance, our number is down 4% from previous guidance in terms of total production to 1.875 million ounces, which is largely driven by the Q1 -- expected Q1 impact, as we ramp up Nunavut and we do additional ground support at LaRonde and we'll get into the details of that in a minute.

In 2021, there is no change in the production guidance, although our cash cost guidance is up $50 an ounce, so that's due to increases in costs, but also just inflationary cost pressures in the business. When we look at Nunavut and LaRonde, starting with Nunavut, as we said, the ramp up was slower than we had expected. And that's clearly on all of us. We should have done a much better job in anticipating and reacting to some of these issues. We have high expectations and we didn't meet those expectations. Fortunately, we continue to make steady progress in productivity and efficiency efforts at Nunavut and we expect to see production increase and cost decrease in Q2 and through the second half of 2020.

At Meadowbank, essentially as we had explained in 2019, we did get delayed due to excess water. We had -- the entire pit was pumped out in October of 2019 and that allowed us to improve the efficiency in the open pit, although we were still limited in the fourth quarter with a smaller footprint due to having just pumped out the pit in October. We are seeing improvements in the mining rate now and drilling performance. There's still optimization efforts around those initiatives in the pit. We will also see optimization efforts as we ramp up construction and eliminate costs that's still are on-site after the construction.

One of the areas that we're focused on is equipment availability and maintenance. We've made major headway there. The warehouse is now complete. We've begun the changeover in terms of stocking that warehouse from Meadowbank. So all of those things will help with the performance at Amaruq and Meadowbank, as we move through 2020. We're still assessing the underground opportunity there at Amaruq. We would expect to have more information in the second half of this year and we could expect production to begin from the underground in 2022.

At Meliadine, we continue to ramp up at Meliadine. Mining is actually going well at Meliadine. In December, we were approaching budget levels in terms of mine performance. We mined almost 4,000 tonnes a day in December of 2019, which was a significant improvement over what we were doing in the third quarter of 2019. So there is more work to do in underground maintenance and mobile equipment, but that's more optimization efficiency. Where we did have more of a challenge is not in recoveries in the mill. Our recoveries are, as expected, approaching 95%. The plant can handle and did handle in the fourth quarter an average over 3,500 tonnes a day. What we're experiencing now is that the front of the plant in the apron feeder area. So we have a temporary fix there. That's limiting the amount of tonnes that we can get through the plant. We should have that fixed, as we move into the second quarter of this year, which will result in a much more efficient operation of the plant. We have also decided that we're moving forward with the Phase 2 expansion that provides more flexibility in the mine plan, and that is currently under way, and we'd expect to see production from that as we move through 2021, 2022.

At LaRonde, we've decided that as we move into the West mine area, which is our highest grade area, to add additional ground support. As we said, LaRonde had outstanding performance in the fourth quarter. It had record production from that mine. It had cash costs of $422 an ounce. It had an average grade in November of over 7 grams per tonne. So that's a big part of the future of the mine at LaRonde and the cash generating ability of LaRonde.

LaRonde actually last year set a record for safety performance, an all-time record for safety performance. As we moved in for the West mine area, geology is a bit more complex and we thought that it was prudent and cautious to add additional ground support in the major infrastructure. So that includes additional bolting, additional screening, additional shotcrete. We expect this to be completed in a few weeks at minimal capital cost and also has a very minimal effect on future cost per tonne. So you combine that in the first quarter with a slower ramp up in Nunavut and you have the impact that we have on guidance going down 4% for 2020, but also you have the impact on unit costs and most of that is being felt in the first quarter of 2020. And as we move into Q2 and beyond, not only does production increase, but unit costs go down.

Moving beyond the three-year guidance, just on the production growth, as we mentioned, the production growth is 18% from 2019 to 2022, with the newly released guidance in 2022 of 2.1 million ounces with a focus now on the project pipeline to see which project actually makes sense to allocate capital to and grow the business in a steady measured fashion beyond 2022, so we continue to do work on Amaruq underground and on Kirkland Lake on Odyssey, East Malartic.

Our reserves, we used the $1,200 gold price to calculate our reserves. Our reserves were down slightly, but our grade increased almost 5% to 2.83 grams per tonne from 2.7 grams per tonne. But we saw a significant increase in our mineral resources and our inferred mineral resources. Our indicated grew by 4% and our inferred grew by 19%. So it's those resources in our project pipeline that we're currently studying now to see how we allocate capital and which project we decide to build to continue the growth beyond 2022 from 2.1 million ounces.

Just looking at some of the mines in particular in more detail in the fourth quarter, we mentioned LaRonde at record performance. When you combine LaRonde and LaRonde Complex, 112,000 ounces at LaRonde, almost 100,000 ounces, as we mentioned at $422 per ounce. We also had good solid performance at Goldex, which continues to exceed budget. Goldex actually had its best year ever from a safety performance. Canadian Malartic, steady producer, good cash costs at $630 an ounce. Kittila, better performance, also set an all-time record in safety in 2019.

You can see the impact of Meadowbank in the fourth quarter, a little over 60,000 ounces, but cash cost of $1,400 which skews the entire combined cash cost number up and that's the issue in Q1 of this year, as we continue to ramp up that higher unit costs in Nunavut, which skew all of 2020. So that's why we're looking for better cost performance in Q2 and beyond. And in Mexico, we continue to get good cash generation out of that business.

From a financial highlight perspective, we mentioned earlier in the call, we had record cash provided from operating activities of almost $900 million in 2019 on 1.782 million ounces of production, which was also a record. From a financial position perspective, we continue to add to our cash position. We closed essentially with $328 million in cash at the end of December. Our $1.2 billion credit line is fully undrawn. We have a debt maturity in April and we've got several options to pay that, drawdown some cash, drawdown a bit of the line of credit, potentially term some of that $360 million out, not all of it, but we could do some of it. Interest rates would be less than half of what we're currently paying on the $360 million maturity. So really good financial flexibility as we move forward in a way that allows us to grow production, as we said, 18% and generate free cash flow.

On Page 12 in the slide deck, we see a continued growth in operating margin coming out of the mines with relatively flat capex as we go forward. We still have to decide it how we're going to allocate that capex. We're still doing assessments on the pipeline, but our focus is on stretching those projects out and stretching that capex out. So while we're growing, we're still generating net free cash flow to invest in the business, pay down debt and increase the dividends.

And, before we take questions, I'll just end on the dividend slide. Our dividend is now $0.80 a share. With the increase in the quarterly amount of $0.20 this quarter, you can see that we've increased our total cash paid out in dividends in the last six years, and that was during a period of heavy construction, as we built the expanded Nunavut platform.

So, I'll close on that and operator, if you can, please open the line up and we'll be happy to take your questions.

Questions and Answers:

Operator

[Operator Instructions] Your first question comes from the line of Fahad Tariq from Credit Suisse. Your line is open.

Fahad Tariq -- Credit Suisse -- Analyst

Hi, good morning. It's Fahad from Credit Suisse. What are the critical steps really to rightsize Amaruq in Q1. I'm just curious, it sounds like the dewatering is kind of done, it's more to do with maybe logistics, like equipment availability, moving the workforce. Like, if you could just walk us through, like what are the kind of steps that are needed to get back on track at Amaruq? Thanks.

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, the -- hi, it's Yvon. We're presently -- the drilling is essentially progressing very well, drilling and blasting. That's pretty well under control at this stage. Our inventory of broken material is also under control at this stage. We are opening up more services in the pit and getting access for the remainder of the pit that's under lake bed. So a lot of digging in these areas. So that's still little bit of a challenging, because in some cases we're still getting some influence from the water. But overall, at this stage, other than weather issues presently, we're progressively ramping up and getting progressive increase in production on basically month by month. And this will continue into the -- pretty well into the second quarter, mid second quarter, at which point, we're pretty well be on a rhythm of normal mining going forward.

Fahad Tariq -- Credit Suisse -- Analyst

Okay. And just on like the specifically in the release, there was something on equipment availability, moving the workforce, and like how -- what are the issues that you are encountering there?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, I think in the beginning -- late December and the beginning of the year, a lot of focus has been put toward improving use of -- utilization for the equipment. We've had a lot of progress in that area, where we are still lagging a bit and we're getting some support internally and externally, is -- basically on maintenance, and I think we've sort of restructured the maintenance areas, where -- because of delivery -- late delivery of some of the infrastructure, all our maintenance now gone on the long-haul truck is done exclusively through our Meadowbank maintenance facilities and the hauling fleet and mining fleet at the Amaruq is essentially done at site with the warehouse present.

So the reassembly of the team, the redistribution of the people essentially completed in Q4. And they are in the process of putting in the rest in place. I think up till Q4, we still had significant amount of major rebuild going on. Those are not all complete, but there are less of a burden on the total crew. And basically it's trying to get the availability up over the next few months.

Fahad Tariq -- Credit Suisse -- Analyst

Okay. Thank you.

Operator

Your next question comes from the line of Matthew Murphy from Barclays. Your line is open.

Matthew Murphy -- Barclays -- Analyst

Hi, just a question on costs. I mean, there is some discussion in the release about inflation, specifically consumables and labor. And, I guess, how recent have you been seeing that? And to what degree do you think this is kind of a permanent move versus -- try to [Phonetic] sort of improve productivity and get costs back down?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, I think the installation has been relatively steady over the years. I think one of the biggest factors we're probably dealing with is, we still have a fair proportion of contractor usage and I think the -- with the current economical cycle, the quality of some of this man power and the productivity of some of this man power is sort of not necessarily helping, which is contributing to in some cases greater costs. I think that has been more of the issue and probably more predominant in Nunavut actually.

Matthew Murphy -- Barclays -- Analyst

Okay. And, I mean, depending on the trajectory for costs and the gold price, I've got a question on the dividend. If we saw costs remaining fairly sticky and the gold price going back to $1,400 or something like that, what's the thinking on funding the dividend?

Sean Boyd -- Vice Chairman and Chief Executive Officer

The dividend at $0.80 is secure. From a cost perspective, as we said in the release, we expect to have unit costs lower as we move through 2020 and into 2021 and '22. And, we have our growing production base. So a combination of the growing production base and costs that are trending down on a unit cost basis allows us to pay that dividend of roughly $200 million a year.

Matthew Murphy -- Barclays -- Analyst

Okay. Thank you.

Operator

Your next question comes from the line of Josh Wolfson from RBC. Your line is open.

Josh Wolfson -- RBC -- Analyst

Thank you. Going back to the Nunavut costs, I think historically if you had looked at the life of mine costs for Amaruq guidance, where there was around $800 an ounce. Meliadine was in the low $600 per ounce. Would you expect changes to those long-term numbers and what sort of order of magnitude would that be?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

The cost for -- I'll start with the cost at Amaruq for now. I think the -- this year's 2000 numbers -- 2020 numbers are mostly aligned with the higher stripping ratio, and lower grade overall in the pit, which contributes to the lower production profile and essentially higher cash costs. We're also processing some low-grade material also contributing to some of the cost structure for 2020.

As we move into 2021 onwards, strip ratio remains a little bit high, but the proportion of high-grade ore increases. And that's the -- from year to year, the production profile at Amaruq will increase, I think 120,000 ounces more next year. So, the cost structure will come down with time. At Meliadine, I think the -- we have available capacity in the plant. And so far, the mine has responded quite well and we'll continue to ramp up tonnage wise. I think so far, early in the year, we're surpassing 4,000 tonnes per day from the underground mine. And, we have stockpile on surface, so we will maximize that tonnage through time and the cost will also come down a bit and go back to the life of mine numbers that we're showing at this stage.

Josh Wolfson -- RBC -- Analyst

Okay, maybe put another way, on the -- I guess, the historical cost targets, is it safe to assume that the inflation experienced in Nunavut would be above that roughly 3% to 5% that was discussed in terms of the underlying sort of input-related items?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, I think the first half of the year will show similar or some cost pressures, but as we pursue the ramp up and we get to, I guess, steady state, the costs are expected to go down, because we've added quite a bit of resource to support our continuous improvement initiatives, to get productivity and cost structures done. So, at this stage we're expecting some and we've already seen some results so far. But the -- we're not just hoping the costs will go down, we're putting efforts and an action plan in place to ensure that.

Josh Wolfson -- RBC -- Analyst

Okay. And then, second question on the cost side of things. For Mexico, we saw a general increase in 2019 costs over 2018 and the guidance seems similar year-over-year for 2020. Should we be assuming kind of steady state La India, Pinos Altos costs going forward at their current figures?

Sean Boyd -- Vice Chairman and Chief Executive Officer

In short, yes. I think the costs that we saw last year -- costs that we saw last year are from some instabilities that we had at Pinos Altos mainly. At La India, it was the effect of clay in the ore, but measures taken in June 2019 were to mitigate those and to bring the costs down and bring the production up, which is the underlier in 2020. So, we will see the costs reduce during 2020, but essentially where we are.

Josh Wolfson -- RBC -- Analyst

Okay. That's very helpful. Thank you.

Operator

Your next question comes from the line of Anita Soni from CIBC. Your line is open.

Anita Soni -- CIBC -- Analyst

Good morning. Can you hear me?

Sean Boyd -- Vice Chairman and Chief Executive Officer

Yes, we can.

Anita Soni -- CIBC -- Analyst

Thanks. So my question, I guess, is a little bit on -- more on Meliadine and not to put a too fine a point on it, but in terms of the throughput rates, you mentioned that you were at 4,000 tonnes in December. So once you have the apron feeder fixed, I guess, in the first quarter, would you expect to get back up to the 4,000 tonne per day? Is it like really low in Q1 and then Q2, Q3 rebound?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, when I said the -- we're at 4,000 tonnes per day, that's the underground mine.

Anita Soni -- CIBC -- Analyst

Yeah.

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

The mill has been operated actually in 2019, anywhere between 3,000 tonnes up to almost 5,000 tonnes per day. So, once the crushing part of the equation is out of the picture, it is expected to bring back up past 4,000 tonnes per day. And in Q4, as we sequence mining wise, with the pit comes into play, it's already expected that the mill will ramp up around 4,600 tonnes per day at that stage, but we'll probably be in a catch-up mode before that.

Anita Soni -- CIBC -- Analyst

Okay. And then, just on the costs, not to beat a dead horse on Amaruq, but 145 [Phonetic], how much of that is just equipment availability issues and how much of that is just the fact that the mill is kind of -- or the milling rates are sort of 7,700 tonne per day and that's a 10,000 tonne per day mill? Like how much is it dependent on getting new ore sources in 2022?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Well, I think at this stage, it's mostly mining cost and grade, that's the big issue. I think our processing costs haven't -- have been a little bit higher, because we've been operating at lower tonnage, but that's part of the reality is we're ramping up. So, not sure I'm answering your question here.

Anita Soni -- CIBC -- Analyst

I think you are. And then, just in terms of the LaRonde sequencing. So, you're moving to sort of a 350,000, 360,000 level on the unit cost. Are these -- sorry, on the production side of the equation. Are the unit costs -- like are there -- is there room for improvement on the unit costs, once you get the rock mechanics issues settled and figure out how to improve upon your mining there?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

I'd have to say probably not. I think a biggest challenge going forward is that the -- as we continue to advance the mining sequence in the LaRonde deep, the overall tonnage per day keeps going down in life of mine sequence. So, productivity is actually going down. So, it will put pressure on the costs. We're doing some work on the adapting strategy used around manpower and automation down the road, which will eventually become like the template for LR-3 at depth. But I think at this stage, I think our cost structure currently is pretty -- is going to stay pretty well in that range.

Anita Soni -- CIBC -- Analyst

Okay. And a last one on Canadian Malartic. So when do you -- I think I was discussing with Brian last night that there was issues in accessing some of the higher-grades in the old stope workings. When do you think that will be resolved and when you'll get back into sort of more stabilized mining there?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Just adding to LaRonde, I think -- the although tonnage will be going down and the grade is going up and as the proportion of ore being mined from the Western sector of the mine, grades in that area are in excess of 8 grams per tonne. So, that's sort of stabilized, although cost per tonne are going up, the cash costs are basically staying flat.

As far as Malartic is concerned, I think we have about 2.5 years of mining left in the pit. We will continue to deal with underground workings like we have in the past. I think the challenge will be to essentially continue to ramp-up, and we're getting good progress in Barnat. We'll probably sequence some of the Barnat differently, potentially. But it's a day-to-day challenge with the blasting. And at this stage, the biggest issue has been related toward the -- remote mucking, basically. That's the biggest challenge that we've had and we're finishing some access work on the main ramps and on the walls that will be in the second half of the year will be easier for the operation.

Anita Soni -- CIBC -- Analyst

Okay. And then, sorry, can I just revert back to La Ronde, you mentioned the higher grades of 8 gram per tonne, obviously that's -- there are two ore sources there, right? So that's not going to be straight 8 gram per tonne material?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

That's correct, yeah.

Anita Soni -- CIBC -- Analyst

But when you hit the 8 grams, what does that do to the rest of the byproducts. As I recall is it gold, copper and silver, zinc. Is that, so you probably get higher copper but lower silver and zinc?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Correct, yeah.

Anita Soni -- CIBC -- Analyst

Okay.

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Copper goes up, and zinc is almost non-existent.

Anita Soni -- CIBC -- Analyst

All right. That's it for my questions. Thank you.

Operator

Your next question comes from the line of John Tumazos. Your line is open.

John Tumazos -- Very Independent Research -- Analyst

Thank you for taking my call and thank you for your service to the Company. Could you give us your philosophy on share buybacks? I know we all hate volatility, and we got a little taste this morning. And second, could you talk a little bit about the step-up in inferred resources this year? You've got 55 million, 60 million ounces total reserves and resources, which of the zones might get into reserves in year-end 2020, '21, '22? I know the documentation always takes longer.

Sean Boyd -- Vice Chairman and Chief Executive Officer

Sure. Just on share buybacks, I think our focus with the increased cash flow will be to reduce overall debt. At this point we're not contemplating share buybacks. So, I think we prefer to improve the strength of the balance sheet. As far as the increase in resources, I'll let Guy [Phonetic] provide some of his color on that.

Guy Gosselin -- Senior Vice President, Exploration

Hi, John. So basically, as you saw this year, we've been bringing more resources in Kirkland Lake for example, as we are continuing to drill and grow the footprint of those deposits, same thing in Amaruq, where we've been adding more drilling in April through a study on the portion of the deposit above the -- from a price [Phonetic] limit to bring it into reserve. And in Malartic as well, where continuous successful drilling at East Gouldie has grown the new East Gouldie Zone. Underlay this one, I think more drilling will be needed. So, we're going to continue to expand the footprint to infill it. So, it's not going to ended up into the reserve anywhere soon, because much more drilling will be needed to get there and better assess the viability. But we're making good progress and now expanding the footprint as well in Mexico onto Santa Gertrudis, where we've been a good contributor to the addition of inferred resource. I think we've been getting good news on several front from growing resources.

And as you can understand, once in a while, some of those projects will ended up being supported by a study and be converted into reserve. So it's an ongoing process this year. We've brought additional satellite open pit at Meliadine into the reserve and brought Amaruq underground and we're working on the next big block that will be moved from resources to reserve.

John Tumazos -- Very Independent Research -- Analyst

[Foreign Speech]

Guy Gosselin -- Senior Vice President, Exploration

Thank you.

Operator

Your next question comes from the line of Ralph Profiti from Eight Capital. Your line is open.

Ralph Profiti -- Eight Capital -- Analyst

Hi there, thanks for taking my questions. Firstly, I see that you've outlined the proportion of the west area at LaRonde in terms of the ore feed. Just wondering what the plan or the mitigation strategy. If you get into 2020 and in 2021 and those ground conditions sort of don't really support the mine plan as it stands now or your visibility, what would be the mitigation plan then?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

We're sort of applying that already in Q1, because we've resequenced the development into the eastern sector to compensate for the lost tonnage, and the team has been quite successful of that. I think longer term to that, we're also in the process of developing other areas within the satellite ore bodies like Zone 11-3 at Bousquet which will bring some production down the road. So, we are thinking all the time about providing not just risk tonnage but also incremental tonnage to the plant because we've got available capacity. So, I think that's the plan at this stage. As far as the the current period -- as far as increasing support in the western sector is essentially to ensure production in that area. And we're pretty confident at this stage that the activities that are being put in place will secure that production for the rest of the year.

Sean Boyd -- Vice Chairman and Chief Executive Officer

I think I'll just add -- I'll just add on that, Ralph. As far as sort of strategy at LaRonde, the strategy has been to as we go deeper to take a very measured approach. So essentially, the cautious mine plan calls for about a 13% reduction in tonnage from the original plan as we move into the deeper part of the ore body. And the strategy over time is to ensure that we can access that higher-grade material by boosting up the ground support in the major infrastructure. So that's just being cautious, and that was a recommendation that came to us in January from the team there who have developed a pretty unique skill set around rock mechanics. So, I think that's critical to the future of LaRonde to be measured as we go deeper. But I think what we're finding in the Abitibi, is we look at some drilling we're seeing on the old Bousquet property, drilling we're getting at East Malartic at East Gouldie. There is still lot of life in these old camps, but in order to access and take advantage and build value, as these resources grow like John said, you need the skills to be able to go deeper and we certainly see that also at Kirkland Lake, another old camp where we have a buildable mine at Upper Beaver.

So I think the opportunity is there. We had -- just have to be measured cautious in the approach there, but we have some really good skills that have been developed that are all in-house, and we sort of take our lead from the team there on how we should approach it.

Ralph Profiti -- Eight Capital -- Analyst

Yeah, thanks for that. Sean, if I could stay with you on a different topic, you talked about this $360 million payment due in April...

Sean Boyd -- Vice Chairman and Chief Executive Officer

Yes.

Ralph Profiti -- Eight Capital -- Analyst

50% of which would be refinanced. It differs a little bit from what I've heard before which is paying down debt as it comes due. How are you thinking about sort of capital allocation? Has this changed sort of in that first half of 2020 or is this cost of financing just too attractive?

Sean Boyd -- Vice Chairman and Chief Executive Officer

I think it's cost of financing is very attractive. I think the stocks we're retiring now is 6.4% or 6.6% -- 6.6%, Dave reminds me. And we'd probably replace that for an interest rate of less than half of that. So, we will repay some of the gross debt, that's part of the plan, but we're just reviewing those alternatives over the next week or two.

Ralph Profiti -- Eight Capital -- Analyst

Got it. Okay. Yeah, good clarity. Thank you.

Operator

Your next question comes from the line of Tanya Jakusconek from Scotiabank. Your line is open.

Tanya Jakusconek -- Scotiabank -- Analyst

Hey, good morning, I think that's me.

Sean Boyd -- Vice Chairman and Chief Executive Officer

Good morning.

Tanya Jakusconek -- Scotiabank -- Analyst

Yeah, I know right, because I got a easier name. I just wanted to circle back, if I could to LaRonde, so that I just understand what's happening. How I interpreted it, what Yvon was saying is that, we've had a change in the mine plan in that, as we've gone deeper with this. The rock mechanics looks like this is going to be more 360,000 ounce long-term mine. Is that a correct way to interpret it?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

I think the way you did interpret it, it's that we cannot sequence as quickly as we had earlier anticipated in the Western sector and that has been evident from the start of development in that zone. The biggest challenge that we have in that sector has not been mining, so far it's been the development. And the protocols that are necessary in the various headings are like much more important in that area. And the sequence at which we can adapt the rest of the sequence is like affected by it. So, this area is very high grade sector and we just need to ensure that we do the mining properly. And so far, we've had a lot of success production wise. We've had very little minimal impact on the production side and we intend to keep it that way. So, that's part of why are the reasons we're taking this pass to increase the support.

Tanya Jakusconek -- Scotiabank -- Analyst

Yeah, no, I appreciate that. I'm just thinking more from a longer-term perspective, I think the camp, when we talked about it was going to be ultimately about a 400,000 ounce producer camp. Is that still what you see excluding this area that you've talked about? I think we talked a bit about lowering the tonnage. Ultimately we've got to reserve grade. So, I'm just wondering if the balance of lowering the tonnage and getting to reserve grade still keeps us at this 360,000 ounce rate? Or do we move back to that 400,000 ounce longer term?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Will be in between the two, I guess. Will be in the 360,000 ounce to 400,000 ounce, a lot of it will come from greater production from LZ5. As we get more productivity from that site, we also have a lot more flexibility from that site, and we're going to maximize it to make sure the complex stays near its objective as much as possible.

Tanya Jakusconek -- Scotiabank -- Analyst

Okay. Okay, that's helpful. Okay. Well, thank you for that. If I can still just come back to Nunavut, so that I -- again just to summarize on my understanding of what has to be done at Amaruq to get the mine back on track. It appears that in the pit, what do you need to get is just more surface areas exposed in there to get to your mining throughput, which you think you'll get there by mid-year. And it looks like the maintenance now has been adjusted between what you're doing at Amaruq site versus what you're doing at Meadowbank. Is it just the utilization -- improvement of utilization of equipment that still has to be done to get you there? And if so, what else -- whats the timing on that?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

It's getting everybody up to speed and it's time. I think the -- we are doing all of this. We're trying to optimize, probably, in the most difficult period of the year under very difficult climatic conditions. So, the speed at which we will do this in Q1 is one. We'll accelerate significantly in Q2, but at this stage, more equipment availability, particularly on the loading side. There is still some challenges, equipment availability wise on the drilling side, but it's mostly on the loading side, that we need to focus and get some of our digging equipment with more hours. The rest is OK at this stage.

Tanya Jakusconek -- Scotiabank -- Analyst

Okay. And then, just maybe on the Amaruq underground, if I could just ask. Saw that you have some of that guidance for production into your 2022 numbers and ultimately beyond. Is it safe to assume on the capital side that that most of the spend is in 2020, 2021?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

It would be mostly second half if we would do approve it and in '21.

Tanya Jakusconek -- Scotiabank -- Analyst

And most in second -- OK. And it would be in that $650 million to $700 million range that would be accounted for in that range -- in that guidance range? Hello?

Sean Boyd -- Vice Chairman and Chief Executive Officer

Yeah, for next year.

Tanya Jakusconek -- Scotiabank -- Analyst

That's for next -- yeah.

Sean Boyd -- Vice Chairman and Chief Executive Officer

Yeah. Can you hear that?

Tanya Jakusconek -- Scotiabank -- Analyst

Yeah, yeah. Yeah, thanks.

Sean Boyd -- Vice Chairman and Chief Executive Officer

$650 million to $700 million in next year.

Tanya Jakusconek -- Scotiabank -- Analyst

In next year? So it would be in there. Okay, perfect. And then if I could just ask one question on Meliadine. We talked about what's happening at the mill in terms of dealing with the apron feeder. Is that something that, Yvon, we're going to need to replace or is it something that is fixable short-term?

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Yeah, we're waiting for parts. It's a unit that's fabricated at Italy. It's a custom unit. So, parts and delivery are very long. So, we're looking with the local supplier to provide parts, that are fabricated to replace them. And the plan is to replace the unit after barge season later this summer. But once the new parts are put in March, we expect it to be back and running at normal capacity.

Tanya Jakusconek -- Scotiabank -- Analyst

Okay. And then maybe just on the underground, because we also have changed the mining sequence in the underground for lower grade. Can you just talk about what happened there for the 2020 plan?

Sean Boyd -- Vice Chairman and Chief Executive Officer

Mostly, I think the sequence was pretty well mined as planned. The only area -- RP3 [Phonetic] area, which was -- we had little bit more saline water in that sector. And we needed to understand that behavior in that area. Some of these stopes were significant tonnage and significant grade which sort of put pressure on the overall grade profile for the rest of the year. This will reserve itself, probably in the second half of this year, and we're expected to restart mining in that area. So, I think, we'll back on grade profile from there.

Tanya Jakusconek -- Scotiabank -- Analyst

Okay. So, second half of the year. Okay, great. Thank you so much.

Operator

[Operator Instructions] There are no further questions at this time. I turn the call back over to Mr. Boyd.

Sean Boyd -- Vice Chairman and Chief Executive Officer

Thank you, operator and thank you everyone. If there's any sort of additional information as a follow-up to this call, please feel free to reach out and we can set up a separate call if you like. Thank you very much.

Operator

[Operator Closing Remarks]

Duration: 46 minutes

Call participants:

Sean Boyd -- Vice Chairman and Chief Executive Officer

Yvon Sylvestre -- Senior Vice President, Operations-Canada and Europe

Guy Gosselin -- Senior Vice President, Exploration

Fahad Tariq -- Credit Suisse -- Analyst

Matthew Murphy -- Barclays -- Analyst

Josh Wolfson -- RBC -- Analyst

Anita Soni -- CIBC -- Analyst

John Tumazos -- Very Independent Research -- Analyst

Ralph Profiti -- Eight Capital -- Analyst

Tanya Jakusconek -- Scotiabank -- Analyst