Please ensure Javascript is enabled for purposes of website accessibility

Boeing Space Launch System Aborts 1 Minute Into an Engine Test

By Rich Smith - Updated Jan 19, 2021 at 11:17AM

You’re reading a free article with opinions that may differ from The Motley Fool’s Premium Investing Services. Become a Motley Fool member today to get instant access to our top analyst recommendations, in-depth research, investing resources, and more. Learn More

Another delay could postpone the planned 2021 moon mission.

Boeing (BA -5.07%) has run into yet another problem.

First there were the two crashes of its 737 MAX, which kept the plane grounded for nearly two years. Then, the company's space program ran into difficulties when its long-awaited Starliner spacecraft failed to reach the International Space Station in 2019.

And now, Boeing has suffered yet another setback. Over the weekend, a test firing of the RS-25 engines that will power the Space Launch System (SLS) that the company is building for NASA was cut short just a minute into an eight-minute test.

SLS engine test at NASA's B-2 Test Stand in Mississippi Jan. 16, 2021.

The test of Boeing's SLS this weekend, which was quickly cut short. Image source: NASA.

Technically, these engines were originally built by Aerojet Rocketdyne (AJRD -0.10%), which is now in the process of being acquired by Lockheed Martin (LMT -0.34%), so there's blame aplenty to go around. But Boeing is the prime contractor on the SLS project, and so it's responsible for making sure all the parts that go into the gigantic spacecraft -- designed to carry American astronauts back to the moon, and then to Mars -- work seamlessly.

The "hot fire test" of SLS's four engines started out well enough Saturday evening. But 67 seconds into the test, which had been planned to run for eight minutes (the length the engines would run in an actual space launch), they shut down for unknown reasons.

In a statement, outgoing NASA administrator Jim Bridenstine insisted the agency gathered valuable data from the test despite the shutdown, and NASA SLS program manager John Honeycutt said the agency will now analyze the data and try to find the "right path forward."    

Depending on how long that takes, though, NASA may have to delay into 2022 a planned 2021 SLS launch for a mission circumnavigating the moon.  

Invest Smarter with The Motley Fool

Join Over 1 Million Premium Members Receiving…

  • New Stock Picks Each Month
  • Detailed Analysis of Companies
  • Model Portfolios
  • Live Streaming During Market Hours
  • And Much More
Get Started Now

Stocks Mentioned

The Boeing Company Stock Quote
The Boeing Company
BA
$120.70 (-5.07%) $-6.44
Lockheed Martin Corporation Stock Quote
Lockheed Martin Corporation
LMT
$424.15 (-0.34%) $-1.47
Aerojet Rocketdyne Holdings, Inc. Stock Quote
Aerojet Rocketdyne Holdings, Inc.
AJRD
$39.34 (-0.10%) $0.04

*Average returns of all recommendations since inception. Cost basis and return based on previous market day close.

Related Articles

Motley Fool Returns

Motley Fool Stock Advisor

Market-beating stocks from our award-winning service.

Stock Advisor Returns
331%
 
S&P 500 Returns
115%

Calculated by average return of all stock recommendations since inception of the Stock Advisor service in February of 2002. Returns as of 05/20/2022.

Discounted offers are only available to new members. Stock Advisor list price is $199 per year.

Premium Investing Services

Invest better with The Motley Fool. Get stock recommendations, portfolio guidance, and more from The Motley Fool's premium services.